4 Prior to assembly
Option 3: Lifting with a crane
Fig. 2-13_002aiAB_Crane transport with Euro pallet (condition at
delivery)
Fig. 2-14_003-iAB_Crane transport with lifting aid
4.6 Attach sealing tape
►
For optimum thermal and acoustic sealing, affix
the enclosed sealing tape
1
over the underside of
the base (over the entire base circumference).
Fig. 2-15_006BG
4.7 Prepare heat pump
Dismantling the cover
►
Loosen the cylinder head screws TX25
1
and
remove the covers.
Fig. 2-16
Installation manual
vampair
13