Initial commissioning
Installation manual
octo
plus
39
7.7 Types of sensors - overview
Measuring
sleeve
Cable
Sensor type
Art.No.
Use
Colour
Material / finish
Length
15 cm
silver
Stainless steel braid
3 m PT100
69688
Flue gas temperature sensor (pellet
plus
, octo
plus
,
thermi
nator
I)
1.6 m PT100
69681
Flue gas temperature sensor (thermi
nator
II 22-30)
2.1 m PT100
69682
Flue gas temperature sensor (thermi
nator
II 36-60,
pellet
top
, pellet
plus
)
1 m PT100
69680
Feed sensor rotary valve (pellet
top
, octo
plus
)
13 cm
grey
PVC cable
2 m PT1000
1622
Flow sensor for fresh water module
fast
5 cm
red
Silicone cable
2.1 m PT100
69687
Feed sensor pellets / wood chips feed
red
Silicone cable
3 m KTY81-110
69686
Return sensor, boiler temperature sensor, exter-
nal boiler sensor
black
PVC cable
3 m KTY81-110
69095
Tank sensor
PVC cable
5 m PT1000
69095-1000 Tank sensor
black
PVC cable
5 m PT1000
69098-1000 Flow sensor
Silicone cable
5 m KTY81-110
69689
Return sensor pellet
top
70
2 cm
grey
PVC twin cable
2 m PT1000
1621-PT
Tank sensor
white
PVC twin cable
2 m KTY81-210/B
1621
Tank sensor
red
Silicone cable
2 m KTY81-210/B
1620
Collector sensor
black
Silicone cable
2 m PT1000
1620-PT
Collector sensor
2 cm x 1.5 Ø
Contact sen-
sor
black
PVC cable
2 m KTY81-110
69098
Flow sensor
-
-
to be provided on-site
-
KTY81-110
69096
Outside temperature sensor; (plastic housing
66x60x39 mm)
-
-
to be provided on-site
-
PT1000
69096-1000
Outside temperature sensor; (plastic housing
66x60x39 mm)
8
Initial commissioning
Initial commissioning of the boiler may only be performed by qualified personnel (SOLARFOCUS service
technician or SOLARFOCUS service partner) (= condition for guarantee / warranty)
Checklist for initial commissioning
Commissioning log
for biomass systems,
Network Scan
function in boiler control
Output test boiler
function
Output test heating circuit
function
Further information on the functions listed can be found in the boiler operation manual.
Boiler-controlled room air flap - electrical connection
Fig. 8-1
When using a boiler-controlled room air
flap, select the
boiler operation
parameter
for the
Reserve relay
parameter (the flap
opens when the burner is running).
Connect the room air flap on the boiler
power element to X6 (230 V AC).
The parameter
Reserve relay
is located in the
Service menu
>
External boiler
.
External boiler request
Time delay external boiler release
Reserve relay
External boiler
Out
External boiler
Boiler operation
Summary of Contents for octoplus
Page 40: ...Initial commissioning 40 Installation manual octoplus 8 1 Commissioning log...
Page 41: ...Initial commissioning Installation manual octoplus 41...
Page 42: ...Initial commissioning 42 Installation manual octoplus 8 2 Customer service order form...
Page 45: ...System schematic Installation manual octoplus 45...
Page 46: ...System schematic 46 Installation manual octoplus...
Page 47: ...System schematic Installation manual octoplus 47...