![SOLARFOCUS maximus L 150 Installation Manual Download Page 42](http://html1.mh-extra.com/html/solarfocus/maximus-l-150/maximus-l-150_installation-manual_1313806042.webp)
8 Installing the intermediate pellet store
Fix retaining plates to the floor
►
Set-up the container horizontally using the adjust-
able feet.
►
Attach 2× retaining plates to the floor with
screws.
DANGER
- The retaining plates of the adjust-
able feet must be securely screwed down as
otherwise there is a risk of the container tip-
ping over and presenting a risk of injury.
Abb. 2-67
Mount the drive unit
►
Mount the drive unit
1
on the shaft
2
and attach
using the securing ring
3
.
Abb. 2-68
Connect pellet hose
Abb. 2-69
Notes on installing the pellet hose
Connect electrical components
►
Connect components; cables are in pre-routed in
ducts 3 and 2
of boiler.
►
Use the cable duct that runs vertically along the
intermediate pellet store.
Abb. 2-70: Intermediate pellet store
1 Pellet suction turbine
X4.13-X4.15
2 Filling level sensor
A1:X49
3 Container auger motor
(
Direct extraction motor 1
)
A3:X2
4 Container flap sensor
A2:X12
42
Installation manual
maximus L