5 Installation
5.3.2 Screw on flue gas pipe flange
►
Connect the flange of the flue gas pipe with 6×
hexagon screws and nuts.
Abb. 2-21: Screw on flange
i
Two additional spacers (8 mm thickness
each) are supplied to facilitate adjustment of
the required spacing and can be used as an
option.
i
Ensure that connection is correctly sealed.
Reliable measures must be taken to prevent
the intake of false air. Failure to observe this
can impair the performance of the burner.
5.3.3 Install automatic ash extraction
i
Hint on assembling the components: Mount
the parts by hand first and then tighten once
they are joined correctly.
►
Check the correct position of the ash auger heat
exchangers: The auger must be locked in the
rear drive in the bayonet mount.
Abb. 2-22: Check auger drive
►
Mount auger trough
1
on heat exchanger.
Abb. 2-23: Mount the auger channel
►
Push metal ring
1
and gasket
2
onto auger
trough.
Abb. 2-24: Slide on sealing elements
►
Screw flange plate onto auger trough.