Connecting Communication to the Meter
If a meter was installed, connect it to the Connection Unit as described in the following table. For detailed
information refer to the installation guide supplied with the meter.
Recommended cable type
(min-max AWG)
Connection Unit
Meter connection
RS485 24 AWG (16-24 AWG),
shielded twisted pair, 600V
insulated
Ext. Devices 7-pin terminal
block: B, A, G
RS485 4-pin terminal block: B, A, G
Connect as illustrated below:
Figure 25: Connection to a meter