All LEDs turn on while the inverter is being configured.
Figure 5: Inverter front view
l
AC and DC conduit entries
: Connection points of the StorEdge Connection Unit.
l
ON/OFF switch
: Turning this switch ON starts the operation of the power optimizers, enables power
production and allows the inverter to begin exporting power to the utility grid/backed-up loads.
Turning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of
power. When this switch is OFF, the inverter control circuitry remains powered up.
l
LCD light button
: Pressing this button lights up the LCD for 30 seconds. In addition, you can press
this button to view inverter status screens and access configuration menu options, as described
Configuring the Inverter Using the LCD Light Button
l
Two communication glands
, for connection of inverter communication options. Each gland has
three openings. Refer to
Setting Up Communication to the Monitoring Portal
on page 59 for more
information.
Figure 6: StorEdge Connection Unit
l
DC Safety Switch
: disconnects both the positive and negative conductors of the PV and the positive
and negative conductors of the battery.
l
AC output
: Cable glands for connection of grid and backed up loads
l
DC input
: For connection of the PV installation and the battery
l
Communication and control gland
: for connection of inverter communication options, meter,
battery thermal power 12V and battery control.