Activation and Firmware Upgrade
2.1
Turn the inverter ON/OFF switch to OFF and make sure it's OFF during the entire upgrade process.
2.2
LG Chem Batteries (primary and secondary): Switch on the disconnect/auxiliary power switch and then the circuit breaker.
2.3
Turn the AC to the inverter OFF.
2.4
Verify that the serial number on the activation card supplied with the inverter matches the serial number of the inverter.
2.5
Insert the activation card to the designated slot located on the inverter communication board.
2.6
Turn ON the inverter ON/OFF switch.
2.7
Turn ON the AC to the inverter to start activation.
2.8
Wait until the LCD indicates that the inverter activation process is completed.
2.9
Turn the AC to the inverter OFF.
2.10
Remove the activation card from the inverter.
2.11
Download the latest firmware version available at:
https://www.solaredge.com/storedge/firmware
2.12
Insert the microSD card with the upgrade file to the designated slot located on the inverter communication board.
2.13
Turn the AC to the inverter ON.
2.14
Wait until the LCD indicates that the file was uploaded to the inverter and the battery.
Note: The firmware is upgraded first on the inverter, and then on the battery. When the battery firmware update is in process, the ON light will blink.