![SolarEdge SE3K-N4 Installation Manual Download Page 65](http://html1.mh-extra.com/html/solaredge/se3k-n4/se3k-n4_installation-manual_1313739065.webp)
RS485 Bus Configuration
To connect to the monitoring platform:
1. Designate a single inverter as the connection point between the RS485 bus and the SolarEdge
monitoring platform. This inverter will serve as the master inverter.
2. Connect the master to the SolarEdge monitoring platform via the LAN option (refer to
on page 58) or any of the other options.
To configure the RS485 bus:
All inverters are configured by default as slaves. To configure the master:
1. Verify the ON/OFF/P switch is OFF.
2. Verify the AC is on.
3. Turn ON the Connection Unit.
4. Use SetApp to access the
Commissioning
main menu screen as described in
40.
5. From the main menu tap
Communication
. The Communication screen is displayed:
Communication
Server
LAN
›
LAN
DHCP
›
RS485-1
SolarEdge Slave
›
RS485-2
Multi -Device
(Modbus)
›
ZigBee
Home Automation
Master
›
Wi-Fi
SEDG-7E129A09-33
›
RS232
SolarEdge GSM
Cellular
N/A
›
GPIO
RRCR
›
Modbus
TCP port
Disable
›
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
64
RS485 Bus Configuration