Power Control
Step 3: Verifying Proper Activation and
Commissioning
1. Select
Information
and verify that the correct firmware versions are installed on each
inverter.
2. Select
Status
and verify that inverter is operating and producing power.
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
Reporting and Monitoring Installation Data
Monitoring the site requires connecting the to the monitoring platform, using any of
the wired or wireless options available from SolarEdge. Refer to
Communication with the Monitoring Platform on page 37.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and inverter
yield assurance through immediate fault detection and alerts at the module, string and
system level.
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as modules, by comparing their
performance to that of other components of the same type.
Pinpoint the location of alerted components using the physical layout.
The monitoring platform enables accessing site information, including up-to-date
information viewed in a physical or logical view:
Logical Layout: Shows a schematic tree-layout of the components in the system,
such as: inverters, Power Optimisers, strings, modules, meters and sensors, as well
as their electrical connectivity. This view enables you to see which modules are
connected in each string, which strings are connected to each inverter, and so on.
Physical Layout: Provides a bird's eye view of the actual placement of modules in
the site, and allows pinpoint issues to the exact location of each module on a
virtual site map.
Three Phase Inverter with SetApp Configuration
51
Step 3: Verifying Proper Activation and Commissioning
Summary of Contents for SE15K-AU
Page 64: ......