
Inverter RS485-1 - pull out the RS485 connector located
on the communication board.
Inverter with Display
Inverter using SetApp
Figure 12: Inverter RS485 connectors
Inverter RS485 Plug-in - pull out the 3-pin connector
Figure 13: RS485 Plug-in on Single/Three Phase inverter
CCG - use one of the 3-pin connectors supplied with
the CCG. Connect it to the RS485-2 connection on the
CCG.
Revenue Grade Energy Meter with Modbus Connection Installation Guide MAN-01-00609-1.0
Chapter 2: Meter Installation
25