
Figure 11: Three Phase Grid (Delta) - Production Meter Connections
NOTE
Clamp the CT connected to
L1 CT
around the wire
connected to
ØL1
.
Clamp the CT connected to
L2 CT
around the wire
connected to
ØL2
.
Clamp the CT connected to
L3 CT
around the wire
connected to
ØL3
.
Revenue Grade Energy Meter with Modbus Connection Installation Guide MAN-01-00609-1.0
Chapter 2: Meter Installation
23