![SolarEdge SE K Series Installation Manual Download Page 43](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719043.webp)
Figure 25: Connecting AC wires to the AC terminals
8. Place the upper cover of the AC terminal block and push until a lock click is heard.
Close the Synergy Manager cover and secure it by tightening the six screws with a
torque of 3.5 N*m.
Three Phase Inverters with Synergy Technology
42
Connecting Ground and AC Wires to the Synergy Manager
Summary of Contents for SE K Series
Page 74: ......