SolarEdge PV 60MMJ Series Installation Manual Download Page 1

Installation

 

Guide

Smart

 

Modules

Version

 

1.

3

Summary of Contents for PV 60MMJ Series

Page 1: ...Installation Guide Smart Modules Version 1 3...

Page 2: ...e completeness of these documents Please note This product is intended to provide remote shutdown of the SolarEdge PV harvesting system to enable safer access to a building in the event of fire This p...

Page 3: ...a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Changes or modifications not expressly approved by the party responsi...

Page 4: ...ance and Disposal 21 Support Contact Information 22 Version History Version 1 3 March 2020 Modified Chapter 3 Mechanical Installation Add Chapter 4 Reporting and Monitoring Installation Data Version 1...

Page 5: ...drop the PV module or drop objects onto the module Do not attempt to disassemble the modules and do not remove any attached components from the modules Do not scratch or otherwise harm the back sheet...

Page 6: ...f output connectors with bare hands Do not unplug the connectors under laod It is recommended not to work alone Wear a safety belt if working far above the ground Do not wear metallic jewelry which ca...

Page 7: ...Do not touch terminals connectors and modules while the system is on Do not stand walk drop or put objects on the module Damaged modules broken glass torn back sheet broken junction box broken connect...

Page 8: ...ion When installing the module installers must conform to all safety precautions detailed in this guide Limitation of Liability Because the use of this manual and the conditions or methods of installa...

Page 9: ...C The fire safety rating of this module is valid only when mounted in the manner specified in the mechanical mounting instructions Do not install modules at locations that come with direct contact of...

Page 10: ...the middle clamps are a 40 mm b 26 mm c 8 mm d 28 mm and 9 mm SeeFigure 2 The recommended torque for tightening the bolts and nuts is 28 N m when the bolts and nuts have property is Class 8 8 To fast...

Page 11: ...Figure 3 End clamp and middle clamp installation 6 For mounting the supporting rails on the long side of the frame slide bolts through the rail grooves next to the 4 clamp locations The module may be...

Page 12: ...on the long side of the frame 7 For mounting the supporting rails on the short side of the frame slide bolts through the rail grooves next to the 4 clamps locations The module may be clamped only in t...

Page 13: ...Type Series Dimension D E F Clamping Range SPVxxx 60MMJ 1650 992 40 mm 992 mm 50 mm 150 mm Table 3 Modules dimensions for mounting rails on the short side of the frame Smart Modules Installation Guid...

Page 14: ...clamp by attaching a plain washer spring washer and nut in that order Figure 7 Attaching mounting clamp Ensure the clamps overlap the module frame by at least 5 mm 0 2 in Ensure the clamps overlap len...

Page 15: ...washer and nut in that order Figure 8 Clamping the SPVxxx R60LWMG SPVxxx R60LBMG Modules 6 For mounting the supporting rails on the frame slide bolts through the rail grooves next to the four clamp l...

Page 16: ...60LBMG 1776 1052 40 mm 340 550 mm 410 490 mm Table 4 Mounting dimensions for rails on the Monocrystalline PERC module with half cut cell technology and integrated power optimizer Chapter 2 Mechanical...

Page 17: ...determining component voltage ratings conductor capacities over current device ratings and size of controls connected to the PV output Each series connected string of modules shall be provided with th...

Page 18: ...stainless steel See Figure 10 Secure the ground wire on fixed end through fastening bolt note that the copper wire cannot be attached directly to the aluminum Insert the bolt through the fixed end an...

Page 19: ...nverters strings modules meters and sensors as well as their electrical connectivity This view enables you to see which modules are connected in each string which strings are connected to each inverte...

Page 20: ...g platform and enables Simple on site registration of new systems Creating editing and verifying system physical layout Scanning and assigning the module and power optimizer serial numbers in the syst...

Page 21: ...s physical layouttemplate pdf using the detachable 2D barcode stickers on each power optimizer Once the form is completed use the Mapper to scan the 2D codes and create the map in the monitoring platf...

Page 22: ...le with clean non heated water and a gentle implement a sponge for example Never use chemicals on the surface of the module If there is snow use a soft bristled brush to clean the surface of the modul...

Page 23: ...mobile application LCD screen or on the monitoring platform or by the LEDs if there is such an indication System configuration information including the type and number of modules connected and the nu...

Page 24: ......