31
L20, L30
Figure 24 Build-in battery connection of L20-IB60 (3*20pcs)
NOTE!
The BAT+ of the UPS connect poles is connected to the anode of the positive
battery, the BAT-N is connected to the cathode of the positive battery and the
anode of the negative battery, the BAT- is connected to the cathode of the
negative battery.
Factory setting of the standard unit is battery quantity--- Maximum 60pcs,
battery capacity--- Maximum 12V/9Ah.
CAUTION!
Note that when the System leaves the factory, the internal battery is
disconnected from UPS, so the rear panel grid of UPS needs to be removed, the
battery is connected to the plug-in terminal and fixed, and then installed back
to the rear panel grid before the internal battery can be used. (This operation is
dangerous and requires professional operation)
Summary of Contents for L20-IB60, L20-IB00
Page 2: ......
Page 17: ...9 L20 L30 Figure 5 Install covers...
Page 27: ...19 L20 L30 5 5 Cabinet view Figure 15 Front view Side view of L20 and L30...
Page 31: ...23 L20 L30 5 7 Electrical Diagrams Figure 19 Remote EPO NO and NC port...
Page 32: ...24 L20 L30 Figure 20 External maintenance bypass auxiliary contacts...