
Figure 11: Connecting SolarEdge invertes in a chain
NOTE
Do not cross-connect B, A and G wires.
Do not insert wires into RS485-2 pins.
10. Tighten the terminal block screws.
11. Push the RS485 terminal block firmly all the way into the communication board.
12. Terminate the inverters at the two ends of the chain by switching a termination DIP-
switch inside the inverter to ON (move the switch to the top). The switch is located
on the communication board and is marked
SW7
.
Figure 12: RS485 termination switch
Firefighter Gateway Installation Guide MAN-01-00113-1.4
21
Creating an RS485 Bus Connection