
The gateway must always remain in an ambient temperature of-20°C (-4°F) to +60°C
(140°F).
The gateway power supply requires a socket outlet with a grid voltage of 100 V -
240 V (50/60Hz).
Protect the gateway from dust, wet conditions, corrosive substances and vapors.
Cable specifications:
Connection Type
Cable Type
Maximum Length
RS485
communication
bus (per RS485
port)
Three twisted wires or 4-wire twisted
pair cable (two twisted pairs).
Recommended wire size: 20 AWG /
0.52 mm2
1,000m (3,330 ft)
Ethernet
CAT5/6
100m (325 ft).
NOTE
If using a cable longer than 10 m/33 ft in areas where there is a
risk of induced voltage surges by lightning, it is recommend to
use external surge protection devices. For details refer to:
http://www.solaredge.com/files/pdfs/lightning_surge_protection.pdf
. If
grounded metal conduit are used for routing the communication wires, there
is no need for a lightning protection device.
Installation Workflow
The following provides an overview of the workflow for installing and setting up the
Firefighter Gateway:
Mounting the Firefighter Gateway
, page 16
Connecting the Firefighter Gateway to the SolarEdge installation,
page 18
Configuring the Firefighter Gateway and inverters
Using the Firefighter Gateway to connect the installation to the monitoring server
Firefighter Gateway Installation Guide MAN-01-00113-1.4
15
Installation Workflow