installation ManUal
LX95 commerciaL soLar Lighting FiXtUre
Solar Vision inc.
www.solar-vision.com
T. 1-819-729-0450
Revision 3.0
IMPORTANT NOTES:
• Always install the lighting fixture on the pole before installing the battery.
• The lighting fixture should never be handled with battery installed inside.
• The battery compartment contains a “quick connector” to connect the battery, identified as
“BATTERY”
.
•
The battery compartment also contains two additional wires marked
“EXTERNAL SOLAR PANEL *OP-
TIONAL* “
. These two wires
must never be connected to the battery
, they are used when an additional
external solar panel is installed.
STEP 2, 3
STEP 4
STEP 5
Indicator lights
INSTALLATION
1. Using the supplied 5/16”-18 bolts and hardware,
fasten the battery compartment to the solar module
as indicated on the image #1. Orientation of the battery
box is critical, use the “Door Here” sticker to
confirm orientation.
2.
Install the lighting fixture on a pole with an outer diameter of:
•
127mm (5in) LX95 (square sleeve only on the LX95);
3.
Slide the lighting fixture on top of the pole;
4. Use the 1/4”-20 bolt to secure the luminaire to the pole, the drilling
pattern is at the end of this document;
5. Once the light is in place, open the battery box door and insert the
battery. The battery is standing up for the LX95;
6. Make a quick connection with the quick connect cable;
7. A green indicator light indicates that the luminaire is functionnal.
8. Close the battery box door, the installation is now complete.
LEARNING DELAY
The light requires a 24-hour delay to operate properly according to it’s
program.
Image #1 (step #1)
P.1/4