|
43
August 2020
|
Solar Stik
®
Inc.
PSS-G/RAID Alternative Energy System Deployment Guide
Connect the two (2) Inter-Connect Strips to the 24VDC In port on front-left corner of the PRO-Verter
7000 AGS using two (2) 5’ Inter-Connect Cables.
4 Connect Expander Paks to PRO-Verter
Inter-Connect Strip
Inter-Connect Strip
Li Expander
Pak 2400 (x3)
PRO-Verter
7000
PRO-Verter 7000
Figure 23. Expander Pak to PRO-Verter 7000 AGS connection
Legend
Inter-Connect
Direction of flow energy or comm
5 Connect PRO-Verter Power Hub 2400
Use a 5’ Inter-Connect Cable to connect the Power Hub 24VDC Batt/PRO-Verter
port and the PRO-
Verter’s 24VDC port on the right-hand side.
Power Hub 2400
PRO-Verter
7000 AGS
(right-side view)
24VDC Power Hub 2400
PRO-Verter 7000 AGS
Legend
Inter-Connect
Direction of flow energy or comm
Li Expander
Pak 2400 (x4)
Figure 24. Power Hub 2400 to PRO-Verter 7000 AGS connection