![Solar Stik PSS-G Deployment Manual Download Page 32](http://html1.mh-extra.com/html/solar-stik/pss-g/pss-g_deployment-manual_1313508032.webp)
PSS-G/RAID Alternative Energy System Deployment Guide
August 2020
|
Solar Stik
®
Inc.
32
|
Power Management
PRO-Verter 7000 AGS
Figure 9. PRO-Verter
7000 AGS features and controls
PRO-Verter
User Interface
WebConnect/RMK mounting location
INVERTER
port
ETHERNET port
REMOTE port
AGS Alarm switch
Fans 1 A Max Breaker/LED
Generator Status LED
DC Out 5 A Max Breaker/LED
24VDC 5 A Max Auxiliary Plug
Generator Test button
AC In 60 A Max Breaker /LED
Gen Circuit Ready LED
AC Out 15 A Max Breaker/LED
AC Out 35 A Max Breaker/LED