![Softing FG-200 HSE/FF User Manual Download Page 15](http://html1.mh-extra.com/html/softing/fg-200-hse-ff/fg-200-hse-ff_user-manual_1312374015.webp)
Chapter 3 - Installation
Version EN-112021-1.30.3
15
3.1.2
Mounting and dismounting
Note
Make sure the FG-200 HSE/FF Modbus is mounted in such a way that the power supply can be
easily disconnected.
Note
Depending on the installation position, the maximum ambient operating temperature may
for details.
Installation and inspection
Installation and inspection must be carried out by qualified personnel only (personnel qualified
according to the German standard TRBS 1203 - Technical Regulations for Operational Safety).
The definition of terms can be found in IEC 60079-17.
Mounting
1. Hook the upper notch of the cut-out on the back of the FG-
200 HSE/FF Modbus into a 35 mm DIN rail.
2. Press the FG-200 HSE/FF Modbus down towards the rail
until it slides into place over the lip of the locking bar.
Note
Do not put stress on the system by bending or torsion.
Dismounting
1. Slide a screwdriver diagonally under the housing into the
locking bar.
2. Lever the screwdriver upwards, pull the locking bar
downwards - without tilting the screwdriver - and move the
gateway upwards off the rail.
17
Summary of Contents for FG-200 HSE/FF
Page 1: ...Softing Industrial Automation GmbH FG 200 HSE FF Modbus User Manual Version EN 112021 1 30 3...
Page 49: ...Chapter 6 Using the web interface Version EN 112021 1 30 3 49...
Page 56: ...FG 200 HSE FF Modbus User Manual 56 Version EN 112021 1 30 3...
Page 77: ...Chapter 10 ATEX Type Examination Certificate Version EN 112021 1 30 3 77...
Page 78: ...FG 200 HSE FF Modbus User Manual 78 Version EN 112021 1 30 3...
Page 81: ...Chapter 12 Declarations of conformity Version EN 112021 1 30 3 81...