background image

epGate PN

Quick Startup Guide

Version: EN-072018-1.00

© Softing Industrial Automation GmbH

Summary of Contents for epGate PN

Page 1: ...epGate PN Quick Startup Guide Version EN 072018 1 00 Softing Industrial Automation GmbH...

Page 2: ...to Sec 443 German Civil Code We reserve the right to make any alterations or improvements to these instructions without prior notice The actual design of products may deviate from the information cont...

Page 3: ...out epGate PN 10 2 1 Intended use 10 2 2 Scope of delivery 10 2 3 Supported features 11 2 4 System requirements 11 2 5 Safety precautions Chapter 3 12 Installation 12 3 1 Hardware installation 12 Moun...

Page 4: ...ormation 20 4 3 Changing the password 21 4 4 Updating the firmware Chapter 5 22 LED status indicators 23 5 1 Gateway status LEDs PWR RUN ERR and CFG 25 5 2 PROFINET status LEDs SF and BF 26 5 3 EtherN...

Page 5: ...This page is intentionally left blank Softing Industrial Automation GmbH 5...

Page 6: ...d fully understood the safety requirements and working instructions in this guide 1 3 Typographic conventions The following conventions are used throughout Softing customer documentation Keys buttons...

Page 7: ...used when providing you with helpful user hints 1 4 Document feedback We would like to encourage you to provide feedback and comments to help us improve the documentation If you have a PDF copy of thi...

Page 8: ...field devices have been configured using the Communication Configuration Tool the data is automatically exchanged between the EtherNet IP and the PROFINET network However the amount of data that can...

Page 9: ...trial Automation GmbH 9 Network overview The epGate PN can be managed from your PC with the following tools RS Logix 5000 Studio 5000 or any other EtherNet IP PLC engineering tool Communication Config...

Page 10: ...following parts epGate PN device CD ROM including tools manuals sample projects and additional material Printed Quick Startup Guide 2 3 Supported features The Softing epGate PN gateway supports the fo...

Page 11: ...therNet IP side of the gateway e g part of the plant network the PLC or a local PC tool like Rockwell s BOOTP DHCP Server Ethernet cables and if necessary Ethernet switches 2 5 Safety precautions CAUT...

Page 12: ...or use cables sustaining high temperatures of at least 90 C 3 1 1 Mounting and dismounting Note Make sure the epGate PN is mounted in a manner that the power supply disconnecting device or interrupt...

Page 13: ...o upper notches to the rail 2 Press the device down towards the rail until it locks into place Note Do not put stress on the system by bending or torsion Dismounting 1 Slide a screw driver horizontall...

Page 14: ...Gate PN Quick Startup Guide 14 Softing Industrial Automation GmbH 3 1 2 Connection diagrams The following connection diagram shows the side profile of the epGate PN with its input and output interface...

Page 15: ...cross section of 0 75 to 1 5 mm The ground connection wire must have a cross section of 1 5 mm Pin Signal Description 1 GND Ground 2 Functional earth 3 L Positive supply voltage CAUTION The Functional...

Page 16: ...FINET output 2 Connect the EtherNet IP devices to the EtherNet IP output Note We strongly recommend connecting the two Ethernet interfaces to different physical LAN networks EtherNet IP communication...

Page 17: ...1 ETH 1 Pin Signal Description 1 TX Transmit signal positive 2 TX Transmit signal negative 3 RX Receive signal positive 4 Not used Drain wire 5 Not used Drain wire 6 RX Receive signal negative 7 Not u...

Page 18: ...e CD Softing Fieldbus Gateway Software and Documentation into the CD drive a If Autorun is enabled on your system the startup page is opened b If Autorun is disabled open an Explorer window select you...

Page 19: ...server IP address of the epGate PN The search will open a new window showing the devices connected to your Local Area Network LAN 2 Click on the IP address of your epGate PN in the IP Address column T...

Page 20: ...u can no longer make changes to configurations or settings In this case contact the Softing support The following default logins and passwords are available and can be changed Role Username Password A...

Page 21: ...checkbox your current configuration data will be deleted and your password is reset to default 5 Click Update to download the firmware file and to reboot the system The system performs a firmware file...

Page 22: ...ation upload NET Network displays EtherNet IP Network status Mod Module displays EtherNet IP module status SF system faults displays PROFINET system faults BF bus faults displays PROFINET bus faults T...

Page 23: ...seconds 24V DC power supply is ok PWR RUN ERR CFG Operating system starts approximately 2 seconds PWR RUN ERR CFG Device is running in factory mode only firmware update is possible PWR RUN ERR CFG Dev...

Page 24: ...efer to error description in web browser Diagnosis Logfile Support Data PWR RUN ERR CFG Software error occurred device has restarted automatically and error is reported in log file Delete log file in...

Page 25: ...n successfully configured SF BF Configuration failed PROFINET protocol has not been configured successfully Device issue At least one configured device is not in data exchange mode Non volatile storag...

Page 26: ...ss configured No connections An IP address is configured but no CIP connection is established Connected An IP address is configured at least one CIP connection is established Connection timeout An est...

Page 27: ...vice is operating correctly Standby The device has not been configured Major recoverable fault The device has detected a recoverable error Note An incorrect or inconsistent configuration is considered...

Page 28: ...nt 200 mA maximum input current 1 A allowing for rush in current at switch on Ethernet IEEE 802 3 100BASE TX 10BASE T Minimum ambient operating temperature 40 C see section Installation positions for...

Page 29: ...nt operating temperatures Ta are allowed Minimum distance Provide a minimum distance of 50 mm to the air inlet and air outlet to ensure natural convection Rotated installation position The maximum per...

Page 30: ...epGate PN Quick Startup Guide 30 Softing Industrial Automation GmbH Vertical installation position Minimal distance Maximum permissible ambient temperature Ta 0 mm 40 C 17 5 mm 50 C...

Page 31: ...ard emission for industrial environments EN 61000 6 2 Electromagnetic compatibility EMC Part 6 2 generic standard immunity for industrial environments Note To fulfill the EMC requirements the other co...

Page 32: ...uipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications VCCI This C...

Page 33: ...This page is intentionally left blank Softing Industrial Automation GmbH 33...

Page 34: ...Softing Industrial Automation GmbH Richard Reitzner Allee 6 85540 Haar Germany http industrial softing com 49 89 45 656 340 49 89 45 656 488 info idn softing com...

Reviews: