commModule MBP - Hardware Manual
10
© Softing Industrial Automation GmbH
4
Electrical specifications
4.1
Protocol select
This pin is scanned during start-up.
Fieldbus Protocol
PROT_SEL_P27
description
Fieldbus Foundation FF
High
(internal pullup)
Leave open
The commModule MBP is operating in
Foundation Fieldbus (FF) mode.
Profibus PA
Low
connect to GND
The commModule MBP is operating in Profibus
PA mode.
4.2
Operating conditions
Unless otherwise noted, all specifications apply over the specified operating temperature range.
4.3
Port input and output
The communication module has the following port input and port output specification at Vcc = 3.2V± 4%.
Parameter
Symbol
Min
Max
Unit
Test Conditions
DI: input low voltage
V
IL
Vcc x 0.2
V
DI: input high voltage
V
IH
Vcc x 0.8
V
DO: output low voltage
VOL
0.5
V
IOL = 1mA
DO: output high voltage
V
OH
Vcc – 0.5
V
I
OH
= -1mA
Analog Input
The commModule MBP incorporates a 12bit-A/D converter with a reference voltage of 3.0V
Power Output:
The power budget to supply a connected system from fieldbus is limited.
It is dependent on the rated current from fieldbus, which is adjustable in software
from I
N
= 10mA to 26mA.
Available output power:
P
omax
= approx. 90mW on 6V2_OUT, with I
PO_6V2
= I
N
– 10mA
or:
P
omax
= approx. 70mW on 3V_OUT, with I
PO_3V_OUT
= (I
N
– 10mA) / 0.7
When both power outputs are used, the available power budget is between 70 and 90mW. The slew rate
is controlled. The rise time is 1.43ms. The output current is not limited on the commModule MBP.
Summary of Contents for Data Flow commModule MBP
Page 1: ...Softing Industrial Automation GmbH commModule MBP Hardware Manual Version EN 022018 1 00...
Page 23: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 23...
Page 24: ...commModule MBP Hardware Manual 24 Softing Industrial Automation GmbH...
Page 25: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 25...
Page 26: ...commModule MBP Hardware Manual 26 Softing Industrial Automation GmbH...
Page 28: ...commModule MBP Hardware Manual 28 Softing Industrial Automation GmbH...
Page 29: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 29...
Page 30: ...commModule MBP Hardware Manual 30 Softing Industrial Automation GmbH...
Page 31: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 31...
Page 32: ...commModule MBP Hardware Manual 32 Softing Industrial Automation GmbH...
Page 33: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 33...
Page 34: ...commModule MBP Hardware Manual 34 Softing Industrial Automation GmbH...
Page 35: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 35 8 3 Declaration of Conformity...