HYD 3K~6K-EP
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
。
- 9 -
3. Installation
Installation notes
3.1. Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Therefore, check the outer packing materials before installing the inverter. Check
the outer packing materials for damage, such as holes and cracks. If any damage is
found, do not unpack the
HYD 3K~6K-EP
and contact the dealer as soon as possible.
You are advised to remove the packing materials within 24 hours before installing
the
HYD 3K~6K-EP
inverter.
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and
complete. If any damage is found or any component is missing, contact the dealer.
Table3-1 Components and mechanical parts that should be delivered
NO.
Picture
Description
Quantity
1
Inverter
1pcs
Do NOT install the HYD 3K~6K-EP on flammable material.
Do NOT install the HYD 3K~6K-EP in an area used to store
Flammable or explosive material.
Danger
The enclosure and heat sink are very hot while the inverter is
working, therefore do NOT install the HYD 3K~6K-EP in places
where you might touch them inadvertently.
Caution
Consider the weight of HYD 3K~6K-EP when transporting and
moving the inverters.
Choose an appropriate mounting position and surface.
Assign at least two persons to install the inverter.
Attention