Sodex Sport S12631 Product Sheet Download Page 1

 

 

 
 

 

 

 

DESCRIPTIF 

Alu rectangular tube 20x80 

White powder coated 

 

 

CONFORM 

European norm 

 

EN 748 

 

 

PRODUCT SHEET 

FOLDING BASE FRAME FOR  

SENIOR GOAL 

PRODUCT REF

 

S12631

 

PAIR

 

INSTALLATION 

 

The time to make the assembly of these support frame is estimated for 2 persons, at 20 minutes.

 

 

MAINTENANCE 

The equipment has to be regularly maintained by the owner. It is advised to: 

 

- Check every week that all the screws are correctly tightened 

- Fix paint defects if the module has been damaged, using the adapted paint, specified by the manufacturer. 

- Replace all damaged or missing parts with a spare part recommended by the manufacturer.  

- Clean the product by using dishwasher soap, clean water, and soft cloth. 

 

It is advised to carry out this cleaning once or twice a year, or even more regularly according to the environmental 

conditions (saline environment, …) 

WARRANTY

 

One full year parts and labour guarantee. Every claim regarding the condition of the delivered equipment has to be 

done within the legal period, of the reception of the material. 

The warranty will not apply to: 

    -    All degradation during the transport. 

    -    All degradation due to poor maintenance. 

    -    All degradation due to use differing from which was intended 

    -    Any defect claimed after the end of the legal period. 

    -    Any damage due to a faulty installation or assembly of the module 

 

 1 

Summary of Contents for S12631

Page 1: ...parts with a spare part recommended by the manufacturer Clean the product by using dishwasher soap clean water and soft cloth It is advised to carry out this cleaning once or twice a year or even mor...

Page 2: ...ONING OF THE EQUIPMENT x2 Allen key 6 x24 SS screws M8x15 IMPORTANT The net has to be as sembled into the support frame BE FORE being attached to the goal x24 SS washers 10 Put the equipment in positi...

Page 3: ...80 profile 2 Put screws in position without tightening to keep it loose for the fixation of step 3 3 Slide the other part of the profile 20 x 80 on the sleeves then put the 2 other screws Once the 4 s...

Page 4: ...4 NECESSARY ITEMS ASSEMBLY INSTRUCTION 3 FIXING THE FOLDING BASE FRAME ON GOAL x2 Fix the product to the system on the goal...

Page 5: ...ES x2 6 5 3 4 2 1 D B C A IMPORTANT the nets have to be assembled on the folding base frame BEFORE being fixed on the goal The ends of the net and of the base frame will respectively by named 1 2 3 4...

Page 6: ...LY INSTRUCTION 5 INSERTION OF THE NET IN THE REAR PROFILE x2 D B C A Insert 4 in the C corner and slide it to D Advice Insert the knots one by one in the corner Advice Be careful that the knots don t...

Page 7: ...7 NECESSARY ITEMS ASSEMBLE INSTRUCTION 6 INSERTING THE NET IN THE SIDE PROFILES x2 D B C A Insert 1 in C corner and slide it to A D B C A Insert 2 in D corner and slide it to B...

Page 8: ...ers leaving the top corner thread of the net out through the opening To maintain the system in folded position hang one of the meshes in one of the hooks located on the goal or use a rope For lifting...

Page 9: ...80 profile 2 2 Plastic bubbles cardboard 5 layers 19 2030x900x140 A3 S12631 9 B Accessories 1 Plastic bubbles cardboard 5 layers 4 380x100x30 PACKING LIST FOLDING BASE FRAME FOR SENIOR GOAL PRODUCT RE...

Reviews: