9
7. Slide the upper crank rod into the top of the crank rod
connector (Fig. 16).
8. Align the holes on the connector with the holes in the
upper crank rod, insert the second thumbscrew and turn
clockwise to secure it (Fig. 17).
Discharge Chute Assembly
1. Align the lower chute to the slot in the collar (A), and rotate
clockwise to the locked position (B). (Figs. 18 – 19).
2. Secure in place with the provided screw (Fig. 20).
3.
Position the chute deflector over the discharge chute and
align the holes (Fig. 21).
Fig. 16
Upper crank rod
Lower crank
rod
Crank rod
connector
Fig. 17
Fig. 18
Lower chute
Fig. 19
Locking arrow
Fig. 20
Screw
Fig. 21
Deflector knob
Carriage bolt
Summary of Contents for SJ617E
Page 18: ...18 NOTES...