Smiths Medical International Ltd.
Issue 5 (August 2004)
3200 Service Manual
Page ix
Contents
Figure
Page
4.12
Regulator live (primary) circuit diagram .......................................................... 4-21
4.13
Regulator isolated (secondary) circuit diagram ............................................... 4-22
4.14
Syringe size sensors circuit diagram ............................................................. 4-23
4.15
Status sensors circuit diagram ...................................................................... 4-23
4.16
Distribution board connections ....................................................................... 4-24
4.17
Pressure sensing circuit diagram ................................................................... 4-25
4.18
Membrane switch panel circuit ....................................................................... 4-26
4.19
Internal ribbon cable and ‘D’ connector connections ....................................... 4-26
5.1
Half nut (obsolete)/Super nut ........................................................................... 5-8
5.2
Strengthened front and rear case mouldings .................................................. 5-10
6.1
Outline of dual ramp gauge .............................................................................. 6-4
6.2
Ramp check - Square/Ramp style flags ........................................................... 6-4
6.3
Linear accuracy gauge ..................................................................................... 6-5
6.4
Taper gauge .................................................................................................... 6-5
7.1
General assembly ............................................................................................ 7-3
7.2
Plunger clamp and half nut assembly .............................................................. 7-6
7.3a
Pole clamp assembly diagram - Non-rotating ................................................... 7-7
7.3b
Pole clamp assembly diagram - Rotating ......................................................... 7-8
7.4
Leadscrew assembly ....................................................................................... 7-9
7.5
Main board assembly ..................................................................................... 7-12
7.6
Regulator board assembly - AC Power ........................................................... 7-13
8.1
Braun Perfusor conversion: parts required ....................................................... 8-2
9.1
Diagram of pump chassis connector ................................................................ 9-1
9.2
Power supply circuit diagram ........................................................................... 9-2
9.3
Layout of components on the power supply board ........................................... 9-2
A.1
New modified Syringe Size Sensor Flag .......................................................... A-1
A.2
Order for tightening the case screws ................................................................ A-3
A.3
Size Sensor Flag: general details ..................................................................... A-5
LIST OF FIGURES
(contd.)
Summary of Contents for Graseby 3200
Page 15: ...CHAPTER 1 INTRODUCTION FEATURES and SPECIFICATION 3200 In line Pressure Syringe Pump ...
Page 22: ...CHAPTER 2 CONFIGURATION DIAGNOSTICS and OCCLUSION THRUST 3200 In line Pressure Syringe Pump ...
Page 37: ...CHAPTER 3 FUNCTIONAL DESCRIPTIONS 3200 In line Pressure Syringe Pump ...
Page 43: ...CHAPTER 4 CIRCUIT DESCRIPTIONS 3200 In line Pressure Syringe Pump ...
Page 83: ...CHAPTER 6 FUNCTIONAL TESTS and MANUFACTURNG SETTINGS 3200 In line Pressure Syringe Pump ...
Page 91: ...CHAPTER 7 ILLUSTRATED PARTS LIST 3200 In line Pressure Syringe Pump ...
Page 105: ...CHAPTER 8 BRAUN PERFUSOR CONVERSION 3200 In line Pressure Syringe Pump ...
Page 108: ...CHAPTER 9 DC INPUT VERSION of 3200 3200 In line Pressure Syringe Pump ...
Page 111: ...APPENDIX FITTING a MODIFIED SIZE SENSOR FLAG 3200 In line Pressure Syringe Pump ...