background image

 

 

 

5. Period and scope of warranty

 

The  warrantyd period covers the period which finishes the earliest  among 0.1 million 

operating cycles [with our durability test conditions], 18 months after shipping from us, and 12 
months after starting the use of the product at your place or your customer’s place. 

If the valve has been used outside of the specifications, or if a failure occurs as a result of 

mounting onto a machine or replacement of an assembly, O-ring etc. by the user, the warranty 
cannot be applied. 

Notes

)

The endurance will depend on the operating conditions (such as if the flow rate is large). 

 
For any failure reported within the warranty period which is clearly our responsibility, the 

whole valve will be replaced. This warranty does not apply to any damage incurred due to the 
failure of the valve. 

 
Result of endurance test 
  (Using the circuit shown on the right) 

The valve was opened and closed in an internal   

vacuum state at nominal (room) temperature and   
checked for internal and external leakage and proper 
operation. 

We confirmed that the product satisfies the   

product specifications of 0.1 million cycles. 

The test was performed with FKM, the standard 

sealant material. 

 

 
 
 
 
 
 
 

<Reference> 

The pumping direction is not limited, but if the   

pumping creates a flow stream, the durability of the   
product could be impaired.   

Therefore, the pumping direction shown on the   

right figure (bellows side pumping) is recommended. 

Also, the operating conditions should be checked 

prior to use, as this affects the life of the product. 

 
 
 
 
 
 
 
 

 

 

 

 

 

 

Vacuum pump

Bellows side

Valve side

Chamber

Recommended direction of exhaust

 

M

Blank flange

Tested product orientation : Sideways

1~10 Pa

Endurance test condition

Vacuum pump

Motor drive

 

10 -

 

 

XL*****-OMJ0005-C 

Summary of Contents for XLH16

Page 1: ...Doc no XL OMJ0005 C PRODUCT NAME High Vacuum L Type Valve MODEL Series Product Number XLH Series...

Page 2: ...1 4 Precautions on Design Selection Mounting Piping Wiring Maintenance 2 Product Specific Precautions 2 6 Maintenance parts 3 Specifications 7 4 Construction and Outer dimensions 9 5 Period and scope...

Page 3: ...when configuring the equipment 2 Only personnel with appropriate training should operate machinery and equipment The product specified here may become unsafe if handled incorrectly The assembly opera...

Page 4: ...a replacement product or necessary parts will be provided This limited warranty applies only to our product independently and not to any other damage incurred due to the failure of the product 3 Prior...

Page 5: ...of up to 30m s2 45 to 250Hz Be advised that continuous vibration may cause a decline in durability Arrange piping to avoid excessive vibration or impacts High temperature type temperature specificati...

Page 6: ...take care not to damage any part of it 2 Replace the handle assembly when the valve is approaching the end of its service life For the endurance cycles refer to Chapter 5 Period and Scope of Warranty...

Page 7: ...9 Valve seal 2 Standard B2401 V15V B2401 V24V B2401 P42V AS568 227V Specific B2401 V15 B2401 V24 B2401 P42 AS568 227 Note1 List the optional seal material symbol after the model number except for the...

Page 8: ...ing temperature for the valve is 150o C If the heater temperature is over 200o C or valve temperature is over 150o C please use thermostat to control the Model XLH 16 XLH 25 XLH 40 XLH 50 Flange valve...

Page 9: ...ater assemblies are used the inrush current to the heaters will be magnified and care should be taken When multiple heater assemblies or valves are used do not apply power to the heater assemblies sim...

Page 10: ...erial SUS304 Body Material A6063 Heater option Handle Ass y Maintenance part Including Exterior seal Maintenance part Valve seal Maintenance part A A B G H C C D E E F Model H XLH 16 40 100 5 38 1 30...

Page 11: ...damage incurred due to the failure of the valve Result of endurance test Using the circuit shown on the right The valve was opened and closed in an internal vacuum state at nominal room temperature an...

Page 12: ...mask Pay attention to the handling of components according to the procedure in the next item onwards Do not apply excessive force or impact This will not only damage the product but also decrease its...

Page 13: ...ove the O ring from the groove for discharging gas using a plastic tool to prevent scratch the O ring groove Take care not to scratch the O ring groove Step 3 Remove the outer seal O ring from the Bod...

Page 14: ...y dust on the valve seal O ring surface Place the O ring on the O ring groove Press the O ring into the groove in numerical order press diagonally to fit the O ring into the groove Take care not to tw...

Page 15: ...tighten manually until the O ring is compressed then perform extra tightening in diagonal order For models with heater tighten Bolt a to mount the Heater to the Body Insert the Cover O ring Bellows ho...

Page 16: ...81 3 5207 8249 Fax 81 3 5298 5362 URL http www smcworld com Note Specifications are subject to change without prior notice and any obligation on the part of the manufacturer 2011 SMC Corporation All R...

Reviews: