background image

S070-TF2Z543EN 
 

Page 2 of 2 

 

6 Maintenance - continued 

  Maintenance  of  pneumatic  systems  should  be  performed  only  by 

qualified personnel. 

  Before performing maintenance, turn off the power supply and be sure 

to  cut  off  the  supply  pressure.  Confirm  that  the  air  is  released  to 
atmosphere. 

  After  installation  and  maintenance,  apply  operating  pressure  and 

power  to  the  equipment  and  perform  appropriate  functional  and 
leakage tests to make sure the equipment is installed correctly. 

  If any electrical connections are disturbed during maintenance, ensure 

they  are  reconnected  correctly  and  safety  checks  are  carried  out  as 
required  to  ensure  continued  compliance  with  applicable  national 
regulations. 

  Do not make any modification to the product. 

  Do  not  disassemble  the  product,  unless  required  by  installation  or 

maintenance instructions. 

6.2  Replacement parts 

Refer to catalogue for replacement parts. 

6.3  Addition and removal of manifold stations 

Refer to catalogue for additional information. 

7 Limitations of Use 

7.1  Limited warranty and disclaimer/compliance requirements 

Refer to Handling Precautions for SMC Products. 

Warning 

7.2  Return of the valve to the de-energised position 

When electricity is cut, the valve returns to the de-energised position by 
spring force. 

7.3  Holding of pressure 

Since  valves  are  subject  to  air  leakage,  they  cannot  be  used  for 
applications such as holding pressure (including vacuum) in a system. 

7.4  Cannot be used as an emergency shut-off valve 

This  product  is  not  designed  for  safety  applications  such  as  an 
emergency shut-off valve. If the valves are used in this type of system, 
other reliable safety assurance measures should be adopted. 

 Caution 

7.5  Leakage voltage 

Ensure that any leakage voltage caused by the leakage current when the 
switching element is OFF causes ≤ 2% of rated voltage across the valve.  

7.6  Low temperature operation 

Unless otherwise indicated in the specifications for each valve, operation 
is possible to -

10˚C, but appropriate measures should be taken to avoid 

solidification or freezing of drainage and moisture, etc.  

7.7  Vacuum release application 

 

Use 3 (R) port for vacuum pressure and 1 (P) port for vacuum release 
pressure.  

 

Set the pressure so that the pressure difference between the 3(R) and 
1(P)  ports  does  not  exceed  the  maximum  operating  pressure  of  the 
valve. 

 

When  the  3(R)  port  is  used  for  the  vacuum  release  (atmospheric 
pressure to positive pressure) and the 1(P) port is used for the vacuum, 
use the normally open (N.O.) specifications. 

 

Figure 4. 

8 Product Disposal 

This  product  shall  not  be  disposed  of  as  municipal  waste.  Check  your 
local regulations and guidelines to dispose this product correctly, in order 
to reduce the impact on human health and the environment. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

9 Contacts 

Refer  to  www.smcworld.com  or  www.smc.eu  for  your  local 
distributor/importer. 

 

 

URL :  

https:// www.smcworld.com (Global)      https:// www.smc.eu (Europe) 

SMC Corporation, 4-14-1, Sotokanda, Chiyoda-ku, Tokyo 101-0021, Japan 
Specifications are subject to change without prior notice from the manufacturer.  
© 2022

 

SMC Corporation All Rights Reserved. 

Template DKP50047-F-085M 

Vacuum supply 

Vacuum pad 

Air supply (positive pressure) 

Reviews: