background image

LV

 Series

High Purity Chemical Liquid Valve 

Precautions 1

Be sure to read this before handling the products.

Refer to the back cover for Safety Instructions.

1. Check the specifications.

Give careful consideration to operating conditions such as the

application, fluid and environment, and use within the operat­

ing ranges specified in this catalog.

2. Fluids

Operate after confirming the compatibility of the product's com­

ponent  materials  with  fluids,  using  the  check  list  on  page 

7

.

 

Please  contact  SMC  regarding  fluids  other  than  those  in  the

 

check  list.  Operate  within  the  indicated  fluid  temperature

 

range.

3. Maintenance space

Ensure the necessary space for maintenance and inspections.

4. Fluid pressure range

Keep the supplied fluid pressure within the operating pressure

range shown in the catalog.

5. Ambient environment

Install in an environment where there is no effect from radiant

heat caused by heat sources, etc., and use within the ambient

temperature  range.  After  confirming  the  compatibility  of  the

product's component materi als with the ambient environment,

operate so that fluid does not adhere to the product's exterior

surfaces.

6. Liquid seals

When circulating fluid:
Provide a relief valve in the system so that fluid does not get

into the liquid seal circuit.

7. Countermeasures for static electricity

Since static electricity may be generated depending on the fluid

being used, implement suitable countermeasures.

Warning

1. If air leakage increases or equipment does not oper­

ate properly, stop operation.

After mounting, perform suitable function and leak tests to con­

firm that the mounting is correct.

2. Operation Manual

Mount and operate the product after reading the manual care­

fully  and  understanding  its  contents.  Also,  keep  the  manual

where it can be referred to as necessary.

Mounting

Design / Selection

Warning

3

. Use pilot ports and sensor (breathing) ports as indi­

cated below.

Caution

Piping

PA port

PB port

Sensor (breathing) port

N.C.

Pressure

Breathing

Breathing

N.O.

Breathing

Pressure

Breathing

Double acting Pressure

Pressure

Breathing

1. Preparation before piping

Before piping is connected, it should be thoroughly flushed out

with air or washed to remove chips, cutting oil and other debris

from inside the pipe.
Install piping so that it does not apply pulling, pressing, bend­

ing or other forces on the valve body.

2. Use the tightening torques shown below for the pilot port.

Caution

Piping

Tightening Torque for Operating Port

Operating port

Torque [N·m]

M5

1/6 turn with a tightening tool after first tightening by hand

Rc, NPT1/8

0.8 to 1.0

-4-

Summary of Contents for LVP Series

Page 1: ...Doc no LV50 OMZ0015 PRODUCT NAME Vinyl Chloride Air Operated Valve MODEL Series Product Number LVP series...

Page 2: ...1 Contents 1 Safety Instructions P2 2 Dimensions P4 3 How to Order Specifications P6 4 Applicable Fluids P7 5 Trouble Shooting P8...

Page 3: ...nt failure when configuring the equipment 2 Only personnel with appropriate training should operate machinery and equipment The product specified here may become unsafe if handled incorrectly The asse...

Page 4: ...roduct or necessary parts will be provided This limited warranty applies only to our product independently and not to any other damage incurred due to the failure of the product 3 Prior to using SMC p...

Page 5: ...vide a relief valve in the system so that fluid does not get into the liquid seal circuit 7 Countermeasures for static electricity Since static electricity may be generated depending on the fluid bein...

Page 6: ...with flow rate adjustment open gradually starting from the fully closed state Opening is accomplished by turning the adjustment knob counterclockwise Additionally do not apply excessive force to the a...

Page 7: ...materials fluid that does not corrode rigid vinyl chloride tube PVC unfixed union Nominal dia 16A PVC unfixed union Nominal dia 20A or 25A Rigid vinyl chloride tube Note 1 O D 22 mm Nominal dia 16A R...

Page 8: ...al option N Note 2 Note 1 Note 2 Note 1 Note 2 Note 2 Note 2 Note 2 Compatibility The material and fluid compatibility check list provides reference values as a guide only Note 1 Since static electric...

Page 9: ...e Eliminate particles and install filter Check if the connection of pilot port is correct 2 Fluid does not stop 1 Malfunction of pilot valve 2 Failure of electrical system Replace valve Clean air supp...

Page 10: ...u Tokyo 101 0021 JAPAN Tel 81 3 5207 8249 Fax 81 3 5298 5362 URL https www smcworld com Note Specifications are subject to change without prior notice and any obligation on the part of the manufacture...

Reviews: