- 14 -
2.5 Startup Procedures
Be sure to check the procedure below before use.
(1) Confirmation of the package content
After unpacking everything, check the description on the label to identify the controller and the number of
accessories. If any parts are missing or damaged, please contact your distributor.
Item
Quantity
Controller
(LECPMJ
□□
-
□
)
1 unit
Power supply plug
(LEC-D1-1)
1 piece
Communication plug connector
(LEC-CMJ-
□
)
*1)
1 piece
*1
)
This item is included if you ordered by the part number for a set of communication plug connector.
【
Option
】
●Teaching box
●Controller setting kit
●
Actuator cable
●Communication plug connector
(2) Installation
Please refer to the
“3.4 How to install”
(3) Controller setting
It is necessary to set the address and the communication speed by the rotary switch of controller.
Please refer to the
“4.1 Switch (STAION NO., B RATE)”
(4) PLC Setting
It is necessary to set a parameter of PLC which becoming the master station.
Please refer to the
“4.3 PLC setting”
.
(5) Wiring and connection
Prepare the electric actuator and the cable.
Connect cables, etc. to the connector (CN1 to CN5) of the controller.
Please refer to the
“5 External Wiring Diagram”
for the wiring of the connectors.
Connector
Teaching box
Controller setting kit
Controller
Power supply plug
Communication plug connector
Actuator cable