
HRX-OM- T002
Chapter 4 Starting the Product
4.4
Operation Start and Stop
HRS090 Series
4-8
Except in case of emergency, do not turn off the breaker until the
product has stopped completely. Otherwise it may cause a failure.
4.4.2
Stopping the product
1.
Press the [RUN/STOP] button on the operation panel.
The [RUN] light on the operation panel blinks green at 1 second intervals, and continues
operation to prepare to stop. After approximately 20 seconds, the [RUN] light turns OFF
and the operation stops completely.
Fig. 4-9 Stopping the product
2.
Turn off the earth leakage breaker of the user
’s power supply.
Flash
OFF
等
Press