background image

 

                      

Modbus to BACnet Start-up Guide

 

Page 23 of 25 

Appendix B Reference 

Appendix B.1. LED Functions 

 

 

 

 

 

 

 

 

 

 

 

 

 

Light  Description  

SPL 

SPL  LED  will  be  on  when  a  configured  node  in  the  EZ  Gateway  is  detected  as  being  offline. 
See Node overview screen of the FS-GUI for further details. 

RUN

 

RUN  LED  will  flash  20  seconds  after  power  up,  signifying  normal  operation. The  EZ  Gateway 
will  be  able  to  access  FS-GUI  (refer  to Section  6.3  for more  information)  once  this  LED  starts 
flashing. During the first 20 seconds, the LED should be off 

ERR 

The  ERR  LED  will  go  on  solid  15  seconds  after  power  up.  It  will  turn  off  after  5  seconds.    A 
steady  red  light  will  indicate  there  is  a  system  error  on  the  FieldServer.    If  this  occurs, 
immediately report the related “system error” shown in the error screen of the FS-GUI interface 
to FieldServer Technologies for evaluation. 

RX 

On normal operation of FS-QS-10XX, the RX LED will flash when a message is received on the 
field port of the EZ Gateway. 

TX 

On normal operation of FS-QS-10XX, the TX LED will flash when a message is sent on the field 
port of the EZ Gateway. 

PWR 

This  is  the  power  light  and  should  show  steady  green  at  all  times  when  the  EZ  Gateway  is 
powered. 

 

 

 

 

Figure 20 

– LED allocation 

Summary of Contents for FieldServer FS-EZX-MOD-BAC

Page 1: ...Driver Version 6 15 Document Revision 6 FieldServer Modbus to BACnet Start up Guide FS EZX MOD BAC APPLICABILITY EFFECTIVITY Effective for all systems manufactured after April 2015...

Page 2: ...or purchasing the FieldServer Please call us for Technical support of the FieldServer product Contact Information Sierra Monitor Corporation 1991 Tarob Court Milpitas CA 95035 Contact number 1 408 262...

Page 3: ...x application to discover and connect to the EZ Gateway 10 6 3 2 Using a Web Browser directly 11 6 4 Set IP Address of the EZ Gateway 11 6 4 1 Using the Toolbox Application to set the IP address 11 7...

Page 4: ...rofiles 15 Figure 9 Creating Device Profiles 15 Figure 10 Mapping BACnet addresses to the Modbus Registers 16 Figure 11 Mapping BACnet addresses to the Modbus Registers 16 Figure 12 Define the State T...

Page 5: ...Statement 3 SUPPLIED EQUIPMENT EZ Gateway Preloaded with the Modbus and BACnet drivers All instruction manuals driver manuals configuration manuals and support utilities are available on the USB drive...

Page 6: ...uct comes with tabs for wall or surface mount These can be snapped off if not required DIN Rail Mounting Bracket included in the Accessory Kit or ordered separately Part FS 8915 35 QS 4 1 Dimensions 4...

Page 7: ...ration is subject to the following two conditions This device may not cause harmful interference This device must accept any interference received including interference that may cause undesired opera...

Page 8: ...onnector as shown The following Baud Rates are supported on the R2 Port 4800 9600 19200 38400 57600 115200 5 1 2 RS 485 Connection R1 Port Connect to the 3 pin connector as shown The following Baud Ra...

Page 9: ...hat provides 9 30VDC or 12 24VAC 6 2 Connect the PC to the EZ Gateway over the Ethernet port Connect an Ethernet cable between the PC and EZ Gateway or connect the EZ Gateway and the PC to the Hub swi...

Page 10: ...e Toolbox application from the USB drive or get it from our website http www sierramonitor com customer care resource center filters software downloads Use the Toolbox application to find the EZ Gatew...

Page 11: ...s of the BACnet Router is 192 168 2 101 Subnet Mask is 255 255 255 0 If the PC and the EZ Gateway are on different IP Networks assign a Static IP Address to the PC on the 192 168 2 X network 6 4 Set I...

Page 12: ...teway field Type in a new IP Gateway Note If the EZ Gateway is connected to a router the IP Gateway of the EZ Gateway should be set to the IP address of the router that it is connected to Click Update...

Page 13: ...Modbus to BACnet Start up Guide Page 13 of 25...

Page 14: ...age 14 of 25 7 CONFIGURING THE EZ GATEWAY 7 1 Setting up the Connections The Connections page is used to setup the connection Ports Parameters Click the Save button in the Controls Section once comple...

Page 15: ...lick on the Device Profiles and enter the name of the profile Click on the Edit button next to the name Choose the Modbus addressing parameters Click on the Data Map tab and add the first Modbus addre...

Page 16: ...he BACnet Addresses to the Modbus Registers Repeat for all of the Modbus registers If using a BACnet State Table click on the State Table tab to define the table and its variables Figure 10 Mapping BA...

Page 17: ...ide Page 17 of 25 If you need to define a Notification Class click the Notification Class tab and define the parameters of your class Figure 12 Define the State Table variables Figure 13 Defining Para...

Page 18: ...e Save button to define the Profile Once you have defined your profile you can then export it for backup or future use by hitting the Export Profile button The profile you created will be downloaded t...

Page 19: ...isting exported profile you can import it to the EZ Gateway by going to the Device Profiles section and hitting the arrow to the right of the Add button Please note that you will need to either create...

Page 20: ...e Connection and Node ID for both the incoming Modbus device and the mapped BACnet output Click Add to include the device profile in the Configuration Repeat for all Modbus Devices you plan on connect...

Page 21: ...ew Connections to see the number of messages on each protocol For troubleshooting assistance refer to Appendix A or any of the troubleshooting Appendices in the related Driver Supplements and Configur...

Page 22: ...r to the FieldServer Troubleshooting Guide which can be found at http www sierramonitor com customer care resource center filters software downloads for further information Appendix A 2 Technical supp...

Page 23: ...uld be off ERR The ERR LED will go on solid 15 seconds after power up It will turn off after 5 seconds A steady red light will indicate there is a system error on the FieldServer If this occurs immedi...

Page 24: ...omply with local electrical code Be suited to the expected operating temperature range Meet the current and voltage rating for the EZ Gateway Net Furthermore the interconnecting power cable shall Be o...

Page 25: ...on or on which original identification marks have been removed or altered This Limited Warranty also will not apply to interconnecting cables or wires consumables or to any damage resulting from batte...

Reviews: