SMART LightRaise Installation and User's Guide
7
Console Hardware Kits
To perform the installation, you'll need to use more than one hardware kit. The kit you use
depends on the type of wall onto which you're installing the SMART LightRaise projector
mount.
Use the following chart to determine which kit(s) you need and to verify the kit contents.
Type of Wall
Kit Required
Kit Contents
Concrete or cinder block
Concrete/cinder block
installation kit
•
10 ¼ x 1¾" concrete anchor
screws
•
1
3
/
16
x 3½" masonry drill bit
Drywall installation kit
•
2 self-drilling drywall anchors
•
2 #8 x 1¼" AB truss head
screws
•
2 toggle bolt anchors
•
2 ¼-20 UNC x 1½" Phillips®
pan head bolts
Drywall with wooden studs
Wood stud installation kit
(contained inside the
drywall installation kit)
•
6 #8 x 2½" Phillips round
head wood screws
•
6 #8 burr washers
Drywall installation kit
•
2 self-drilling drywall anchors
•
2 #8 x 1¼" AB truss head
screws
•
2 toggle bolt anchors
•
2 ¼-20 UNC x 1½" Phillips
pan head bolts
Drywall with metal studs
Metal stud installation kit
(contained inside the
drywall installation kit)
•
6 toggle bolt anchors
•
6 ¼-20 UNC x 1½" Phillips
pan head bolts
To use toggle bolts, you'll need to drill two holes:
•
a
¼"
(6 mm)
pilot hole
•
a final ½"
(13 mm)
hole
NOTE:
When drilling holes in metal studs, where possible hit the center of the stud.
In addition to the installation kits, your console accessory kit should include:
•
a registration card, warranty, the SMART Board software CD-ROM, this guide, the
security hex key for the screws used to secure the console to the console bracket
•
a country-specific power adapter, used to connect a VCR or DVD player to the console
power extension