![SMA SUNNY BOY STORAGE 2.5 Operating Manual Download Page 27](http://html1.mh-extra.com/html/sma/sunny-boy-storage-2-5/sunny-boy-storage-2-5_operating-manual_1294496027.webp)
5 Mounting
SMA Solar Technology AG
Operating manual
SBS25-1VL-10-BE-en-13
27
320
665
172
50
985
350
350
Figure 8: Recommended clearances(Dimensions in mm)
5.2
Mounting the Inverter
Additionally required material (not included in the scope of delivery):
☐ Two stainless steel hexagon head wood screws (AF 10, diameter 6 mm), screw length must be
suitable for the support surface and the weight of the inverter (fastening bracket thickness:
4 mm)
☐ Where necessary, two screw anchors suitable for the support surface and the screws
CAUTION
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1.
CAUTION
Risk of injury due to damaged cables
There may be power cables or other supply lines (e.g. gas or water) routed in the wall.
• Ensure that no lines are laid in the wall which could be damaged when drilling holes.
2. Mark the position of the drill holes. Align the markings horizontally.
3. Drill the holes.
Summary of Contents for SUNNY BOY STORAGE 2.5
Page 1: ...SBS25 1VL 10 BE en 13 Version 1 3 ENGLISH Operating manual SUNNY BOY STORAGE 2 5 ...
Page 109: ......
Page 110: ...www SMA Solar com ...