3 Scope of Delivery
SMA Solar Technology AG
Replacement Manual
STPxxx-60-DC-SPD-RM-xx-11
11
Grounding conductor test prior to recommissioning
Prior to recommissioning SMA inverters after the installation of SMA components or power
assemblies which cannot be replaced intuitively, ensure that the grounding conductor in the
inverter is correctly connected. The function of the grounding conductor must be ensured and
all locally applicable laws, standards and directives must be observed.
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3
Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
123263-00.01 - Spare Part DC-SPD board STP 110-60
Quantity
Designation
1
DC SPD assembly
2
4
Screw M4 with spring washer and washer
4
Screw M5 with spring washer and washer
1
Replacement Manual
202086-00.01 - SPD Type 1+2 board for STP 110-6x (retrofit kit) und
202757-00.01 - SPD Type 1+2 board for STP 110-6x (spare part)
Quantity
Designation
1
DC SPD assembly
24
Screw M4 with spring washer and washer
4
Screw M5 with spring washer and washer
4
PCB bracket
1
Replacement Manual
ENGLISH
Summary of Contents for STP 110-60
Page 65: ...1 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 65 1 5 1 6 X703 1 X703 6 10...
Page 68: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 68 5 5...
Page 69: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 69 DC DC AC DC 1100 V...
Page 70: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 70 DC 5 C v v...
Page 221: ......
Page 222: ...www SMA Solar com...