6 Commissioning
SMA Solar Technology AG
System Manual
SPBusiness-SH-en-10
27
2. Select
System parameter assistant
.
3. Select all PV inverters.
4. Select [
Next
].
5. Select the parameter
External communication
and set to
No
.
6. Select [
Next
].
7. Click on [
Save
].
6.11 Configuring SMA SPOT in Sunny Portal powered by
ennexOS (optional)
1. Select
Configuration > System properties
.
2. Activate the
SMA SPOT
switch and enter the data.
6.12 Completing the Commissioning Report
1. Download the commissioning report (Excel file) from the download area at www.SMA-
2. Complete the commissioning report (Excel file).
3. E-mail the completed commissioning report to
EnergySystem-Commissioning-
as an Excel file.
☑ Once the commissioning report has been received, the ten-year system warranty is activated
and you will receive a corresponding confirmation.