Manual_MTR_2021-10-011.00_EN.docx
7
7
OPERATION OF THE MTR
7.1
ASSEMBLING THE COOLING BLOCK
The MTR cooling head with screwed-on insulation element is already pre-assembled. It can be positioned centrally
in the standard object clamp. In order to ensure a permanently secure connection, the knurled screw should be
hand-tightened with a 17mm open-ended spanner. The samples can now be frozen on the front of the structured
surface.
The supplied clamping block must be clamped in the upper position to ensure the central alignment of the
cooling head.
Your device is now ready for use and should look as shown above.
i
Assure that the hose can move up and down freely.
34123507 clamping block 5
Summary of Contents for MTR
Page 2: ......