background image

MODEL EH-M2 ELECTRIC BOILER

Four stage electronic control with energy saving and other features.

EH-08-135-M2 through EH-40-135-M2, single phase, 3 wire, 120/208V, 120/240V
EH-12-345-M2 through EH-40-345-M2, three phase, 4 wire, 120/208V, 120/240V

OPERATION AND INSTALLATION INSTRUCTIONS

CONTENTS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE

Description  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Mounting  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Piping  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 & 4

Air Eliminator and Expansion Tanks  . . . . . . . . . . . . . . . . . .2

Flow Switch  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Bypass . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Wiring (Warning: DO NOT turn on breakers on unit)  . . . . . . . . .2

Wall Thermostat Flow Switch and Circulator  . . . . . . . . . . .2

“Rough-In” Dimensions  . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

Service Connections and Electrical Ratings  . . . . . . . . . . . .6

Electrical Connections & Sensor Locations  . . . . . . . . . . . . . . . .5

Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Fill System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Air Elimination  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Bypass Flow Adjustment  . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Check for Proper Boiler and System Operation  . . . . . . . . .7

Operation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Periodic Inspection  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Control Setup  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8

Appendix A, B, C, & D  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9

IMPORTANT:

This manual must be left with owner and should be hung
on or adjacent to the boiler for reference.

M

ONITRON II

LISTED

89C4

Publication No. EH-M2-40 Rev D • Printed in U.S.A. 315

Part No. 792860000

Heating Contractor

Address

Phone Number

Model Number

Serial Number

Installation Date

Summary of Contents for EH-M2

Page 1: ... unit 2 Wall Thermostat Flow Switch and Circulator 2 Rough In Dimensions 3 Service Connections and Electrical Ratings 6 Electrical Connections Sensor Locations 5 Start up 7 Fill System 7 Air Elimination 7 Bypass Flow Adjustment 7 Check for Proper Boiler and System Operation 7 Operation 7 Periodic Inspection 7 Control Setup 8 Appendix A B C D 9 IMPORTANT This manual must be left with owner and shou...

Page 2: ...oiler up onto the wall bracket again as described in Step 1 Secure the boiler to the wall with the 2 fasteners in the lower rear panel area PIPING Air Separator and Expansion Tanks The recommended piping arrangement is shown in Figures 2 through 4 Note that there is a built in air eliminator in the heat exchanger air vent however is by others A 1 8 air vent may be used bushing is needed for 1 2 NP...

Page 3: ... BE LEVEL 4 19 32 117 ø2 51 KNOCK OUT ø2 1 2 64 ø1 3 8 35 KNOCKOUTS ø1 3 4 44 1 2 PLUG ø2 3 16 56 1 1 4 RETURN ø2 51 KNOCKOUT ø2 1 2 64 ø 1 3 8 KNOCKOUTS ø7 8 22 5 PLACES ø2 51 KNOCK OUT ø2 1 2 64 ø 1 3 8 35 KNOCK OUTS ø2 1 8 54 1 1 4 SUPPLY TOP VIEW BOTTOM VIEW RIGHT SIDE VIEW FACE TABS UP AND FORWARD INSTALL TABS LEVEL STUDS WALL SECURE WALL BRACKET INTO STUDS WITH APPROPRIATE FASTENERS 12 305 M...

Page 4: ...purging 2 Circulator should not be installed at lowest point of piping 3 There should be no elbows tees or change of pipe size for at least 5 diameters of pipe size see Table 2 upstream and downstream of flow switch Flow switch should always be mounted in the horizontal position See Table 2 Figure 2 Typical SIngle Zone Piping Figure 3 Typical Multi Zone Using 2 Way Valves Figure 4 Typical Multi Zo...

Page 5: ...or Included Factory Installed Boiler Outlet Sensor BTC Mode 5 Outdoor Sensor Relay Factory Installed Boiler Outlet Sensor Boiler Inlet Sensor Optional Secondary Piping Sensor Included Figure 5A Sensor Location See EM 10 Manual for details Figure 6 DHW Connections Boiler outlet sensor factory wired and installed in cast iron heat exchanger ...

Page 6: ...e Pipe Length of Flow Switch EH 40 M2 EH 8 M2 thru 32 M2 FS8W FS4 3T3 1 1 1 4 1 8 1 2 6 1 2 SINGLE PHASE 3 WIRE 120 208V Basic Model No Heater Amperes 208V EH8 13 5 M2 EH10 13 5 M2 EH12 13 5 M2 EH16 13 5 M2 EH20 13 5 M2 EH24 13 5 M2 EH28 13 5 M2 EH32 13 5 M2 EH40 13 5 M2 29 36 43 4 58 72 87 101 116 145 SINGLE PHASE 3 WIRE 120 240V Basic Model No Heater Amperes 240V EH8 13 5 M2 EH10 13 5 M2 EH12 13...

Page 7: ...ill be a delay whose response time will depend on operating mode and other settings 3 Current may be checked by a qualified electrician at the feed er panel and compared to the values shown in Table 3 4 Water flow through the boiler should be sufficient to keep the flow switch closed The limit thermostat should also remain closed Consult the multiple stage electronic control manual for control set...

Page 8: ...0 60 Use FACTORY Dip Switch to Adjust Note Some heating equipment may require a minimum water temperature ie fan coils DLY No Entry Not valid for Electric Boiler application BOIL MASS 1 N A N A STG DLY Au if PID in STGMODE N A N A Minimum time between firing stages DIFF Au if PID in STGMODE 2 1 2 1 1 2 differential around target temp STG DIFF 4 2 4 2 Temperature drop at which next stage turns on O...

Page 9: ...ncy THE TERMS OF THE BOILER WARRANTY WILL NOT APPLY TO FAILURES ENCOUNTERED UNDER THESE CIRCUMSTANCES RECOMMENDATIONS On all installations in hard water areas 1 The system should be thoroughly inspected for leaks which must be repaired however minor they may be 2 The initial water charge of the system must be treated to reduce its hardness to an acceptable level In addition to the aforementioned o...

Page 10: ...10 EH M2 40 Boiler Operation and Installation Instructions ...

Page 11: ...EH M2 40 Boiler Operation and Installation Instructions 11 ...

Page 12: ...SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD LTEE Mississauga Ontario www slantfin com ...

Reviews: