Page 50
December 2007
SJ 46AJ
Start Operation
Section 3 - Operation
3.8 Start Operation
Carefully read and completely understand the Operating
Manual and all warnings and instruction labels
(refer to labels section) on the aerial platform.
WARNING
DO NOT
operate this aerial platform
without proper authorization and training.
Failure to avoid this hazard could result
in death or serious injury.
Before operating this aerial platform, perform the
following steps:
1.
Visual and daily maintenance inspections
(see
)
2.
)
3.
Jobsite inspection
It is the responsibility of the operator to perform
a jobsite inspection and avoid the following
hazardous situations:
• holes or drop-offs
• ditches or soft fills
• floor obstructions, bumps or debris
• overhead obstructions
• electrical cords, hoses and high voltage
conductors
• hazardous locations (see NFPA 505)
• inadequate surface support to withstand all
load forces imposed by the aerial platform
• wind and weather conditions
• the presence of unauthorized personnel
• other possible unsafe conditions
WARNING
An operator should not use any aerial platform that:
•
does not appear to be working properly.
•
has been damaged or appears to have worn
or missing parts.
•
has alterations or modifications not approved
by the manufacturer.
•
has safety devices which have been altered
or disabled.
•
has been tagged or locked out for non-use or
repair.
Failure to avoid these hazards could result in death
or serious injury.
3.8-1 To Activate Base Control Console
WARNING
Ensure that you maintain three points of
contact to mount/dismount the platform.
1.
Enter platform and close gate.
2.
On platform control console, pull out “
”
emergency stop button.
3.
For dual fuel engine, select fuel supply by moving
fuel switch to either “
” gasoline or “ ” liquid
propane gas position.
4.
In engine compartment, turn main power
disconnect switch to “ ” on position.
5.
On base control console, turn off/base/platform
(base/off/platform) key switch to
“
”
base
position.
6.
Pull out “
” emergency stop button.
7.
Select “
” start position from start/function
enable/emergency power switch until engine
starts.
WARNING
DO NOT
over crank the starter. If engine
fails to start after multiple attempts,
contact qualified/competent repair
personnel.
CAUTION
Allow engine to warm up for a few minutes
at low speed before applying any load.
3.8-2 To Rotate Platform Using Base Control
Console
1.
Activate and hold function enable switch “
” by
pushing it to the right.
2.
Push platform rotation switch to either “ ” left or
“ ” right position. Release switch to stop.
Summary of Contents for SJ 46AJ
Page 1: ...ARTICULATING BOOMS MODELS SJ46AJ 169510AD A November 2015 OPERATING MANUAL ANSI CSA ...
Page 12: ...Page 12 December 2007 SJ 46AJ Notes ...
Page 62: ...Page 62 December 2007 SJ 46AJ Notes ...
Page 92: ...Page 92 December 2007 SJ 46AJ Notes ...
Page 94: ...www skyjack com Pålitelig lift løsninger av folk som bryr seg ...