You must use a front ballast
whose mass is greater than
or equal to the minimum
required value Frb(min)
Calculation method
➪
Please complete the table on the page opposite
b1
-
Calculating the minimum front ballast
(enter value on page opposite)
Frb(min) = Lt.c – Fal.b + 0.2.Uw.b
a + b
b2
-
Calculating the actual load on the front axle
(enter value on page opposite)
Fal(tot)
= Frb.(a + b) + Frb.b - Lt.c
b
b3
-
Calculating the total actual weight
(enter value on page opposite)
W(tot)
= Frb + Uw + Lt
b3
-
Calculating the actual load on the rear axle
(enter value on page opposite)
Ral(tot) = W(tot) - Fal(tot)
16
B
Before start-up
Summary of Contents for Maxi Drill 6000
Page 2: ......
Page 28: ...26 Mise en route Start up Inbetriebsetzung D 1 2 3 3 ...
Page 30: ...28 Mise en route Start up Inbetriebsetzung D 1 2 ...
Page 32: ...30 Mise en route Start up Inbetriebsetzung E ...
Page 42: ...40 Mise en route Start up Inbetriebsetzung L 2 3 4 1 ...
Page 50: ...48 Réglages Settings Einstellungen C 3 4 2 1 ...
Page 54: ...52 Réglages Settings Einstellungen D ...
Page 64: ...62 A Fertisem 1 2 a a b c ...
Page 68: ...66 Fertisem B 2 1 3 ...
Page 70: ...68 Fertisem D 1 2 ...
Page 74: ...72 Entretien Maintenance Wartung B ...
Page 94: ...92 Entretien Maintenance Wartung J Maxi Drill ...
Page 98: ...96 Conseils Techniques Technical advice Technische Hinweise B ...