SKC Leland Legacy Operating Instructions Manual Download Page 1

Operating Instructions

Leland Legacy

SKC Inc.

863 Valley View Road

Eighty Four, PA 15330

Form #40075 Rev 0606

Summary of Contents for Leland Legacy

Page 1: ...Operating Instructions Leland Legacy SKC Inc 863 Valley View Road Eighty Four PA 15330 Form 40075 Rev 0606 ...

Page 2: ...a Sampling Time 17 Flow Fault 17 Battery Operation 18 Installing Battery Pack 18 Battery Status 19 Low Battery Fault 19 Charging the Battery 19 Charger Status 20 Removing and Replacing the Battery Pack 20 Programming the Pump Using a PC 22 Optional Accessories 23 Service Policy 24 Warranty 25 Indicates a reminder or note Indicates a warning or caution Notice This operating instruction may not addr...

Page 3: ...new setting and place pump in Hold For CalChek Calibration see operating instructions To change temperature scale from F to C or C to F Press then Press until temperature displays Press or to switch units press until End displays then press to save new setting To change atmospheric pressure scale mm mb In Press then Press until pressure displays then press or to switch units press until End displa...

Page 4: ...uces noise Incoming and outgoing airflow is pulsation damp ened The lightweight Leland Legacy is housed in a thermoplastic material for strength and features an over molding of soft rubber that protects against dam age and reduces noise Powered by a rechargeable battery pack containing 10 Li Ion cells the Leland Legacy provides 24 hour run times for 10 L min at 12 inches water back pressure The pu...

Page 5: ...icators Timer Display Range 1 to 99999 minutes 69 days If the run time exceeds 69 days the timer display rolls over Timing Accuracy 1 min month 25 C Atmospheric Pressure Accuracy 0 3 inches Hg Operating Temp Range 32 to 113 F 0 to 45 C Protect sample pump from weather when in use outdoors Typical Run Time Sioutas Impactor 13 in water bp 24 hrs at 9 L min PEM with 37 mm 2 0 µm PTFE filter 225 1709 ...

Page 6: ...he same lot Li Ion Battery Shipment Rechargeable lithium Ion batteries for use with SKC sampling pumps have been tested in accordance with the UN manual of Tests and Criteria and are designated as UN3091 For air shipments Rechargeable lithium Ion batteries in SKC pumps are subject to the A 45 exemption to the IATA regulations and are not regulated for air shipments This information must be written...

Page 7: ...ity code in sequence Setup should appear briefly on the LCD Navigating Press to scroll through parameters Once the LCD shows End parameters will repeat until the user exits Setup Exiting Press until End appears on the LCD Press The pump is now in Hold Setup Options After entering Setup go to 1 Flow Set Press or to increase or decrease pump flow rate Pump will start running Press to move to next pa...

Page 8: ...ed start is selected follow instructions on p 7 5 Time of day Press or to increase or decrease flashing hour Press to move from hours to minutes Press or to increase or decrease flashing minutes Press to move to next parameter 6 ST Sampling Time Allows the user to program a specific run time Press or to increase or decrease the time in minutes up to 99999 minutes Press to move to next parameter Se...

Page 9: ...pling Time on p 16 Setting a Sampling Time ST Program the Leland Legacy from the integral keypad or a PC using DataTrac software to sample from 1 to 99999 minutes 1 Press then press the security code in sequence Setup will display briefly 2 Repeatedly press until ST L min and a flashing time and Set appear on the display 3 Set the sampling time by pressing or to increase or decrease it to the desi...

Page 10: ...lect the hour time of day that the pump is to begin sampling within the next 12 hours by pressing or until the desired hour displays Press and the minutes will flash Press or until the desired minutes display The time of day entered will be the next occurrence of this time within the next 12 hr period after the delayed start is entered There is no a m or p m designation 4 Press until the ST displa...

Page 11: ...rate is displayed press until End appears on the display The pump will stop running 4 Press to save the new flow rate and exit Setup Calibration Flow Rate and Volume Display Flow Rate displayed on the pump LCD is the flow to which the pump has been calibrated To maintain flow as displayed the pump automatically adjusts flow during sampling for changes in temperature and atmospheric pressure that m...

Page 12: ...ss until they are in a g r e e m e n t within 10 ml If the calibrator reads a lower flow rate press until they agree within 10 ml When pressing or the pump display will indi cate the adjustment or correction made in L min 6 Press until End appears 7 Press to save new flow rate and Adj and exit Setup Reset run time data see p 6 If the pump has been programmed with DataTrac Software and switched to ...

Page 13: ...ration Using CalChek The CalChek feature provides correction at a single flow setting and usually takes less than one minute to complete Use it to set the desired flow rate before sampling and to verify flow after sampling The CalChek Communicator adapter contains a 25 pin D type connec tor Do not plug it into an RS232 serial computer port Remember to calibrate with representative sampling media i...

Page 14: ... complete the pump display will either show End indicating that the calibration was successful or it will show an error code of E4 x see CalChek Error Chart p 14 12 Press to place the pump in Hold Disconnect the pump from the representative sampling medium and the calibrator Place a fresh sample medium in line Sample when ready Successful single point calibration will provide an entry in the pump ...

Page 15: ...imum of two minutes before starting the calibration procedure Leave pump on 2 Connect the calibrator outlet to the pump inlet with the tubing supplied with the calibrator Do NOT place sampling medium in line 3 Connect the 25 pin plug on the CalChek Communicator Smart Adapter to the data port on the back of the calibrator and the connector on the flying lead to the pump data port on top of the pump...

Page 16: ... Scheduler Full calibration data can be viewed and printed by going to the DataTrac Pump Manager window in DataTrac Software and clicking on the View menu Choose Calibration Info This will display calibration results pump serial number and date of the last full calibration A button allows this data to be printed The printed report contains pump version date printed and a validation code to perform...

Page 17: ...iston movement then proceeds soon as possible with calibrations Blinks rapidly won t proceed with Replace battery calibration and switches off immediately The CalChek Communicator adapter shuts off within two seconds after the DC Lite Calibrator switches off The CalChek Communicator adapter contains a 25 pin D type connec tor Do not plug it into an RS232 serial computer port Disconnect the CalChek...

Page 18: ...the pump Technical Support at 800 752 8472 E46 Analysis error in the data rare Try full calibration again If problem or E49 persists call SKC Technical Support at 800 752 8472 E47 Less than two bars appear in the battery Recharge the battery icon on the pump display indicating that the battery is too low There must be at least two bars to begin a full calibration At conclusion of full calibration ...

Page 19: ...of the pump display The pump will not operate manually To restore manual operation delete the program See Deleting a DataTrac Program or Delayed Start on p 16 Scrolling Through Data Repeatedly press to view run time or sample time ST sample volume flow rate temperature atmospheric pressure and time of day If the pump is started and stopped manually the pump LCD will count up run time and display c...

Page 20: ... clear this display see Resetting Run Time Data on p 15 Sampling Flow Fault If flow drops by more than 5 the pump goes into Hold and retains historical data The flow fault icon flashes during flow fault The pump will restart in 20 seconds default setting and try to continue sampling If the flow remains restricted the pump returns to flow fault Auto restart is attempted every 20 seconds up to 10 ti...

Page 21: ...ping regulations for lithium ion Li Ion batteries Once installed completely charge battery pack before operating Battery Replacement Notes To retain history make sure the pump has been allowed to go to SLEEP after the last run Turn off the pump before removing the battery Removing the battery while the pump is on or running may corrupt pump history Programs should be reloaded using DataTrac for Le...

Page 22: ... the battery before sampling Charging the Battery The Leland Legacy Sample Pump operates from a rechargeable Lithium Ion battery The battery is charged using single charger Cat No 223 241 includes Cat Nos 223 245 and P22300 Use of a non approved charger voids the SKC warranty 1 Insert the plug on the Charging Unit into the battery charging jack on top of the pump underneath the protective cover 2 ...

Page 23: ...22300 indicates charger status View the LED for at least 5 seconds to determine charge status LED Action Status On steady Charge in progress On quick blink off on Pattern repeats 80 charged Off quick blink on off Pattern repeats Charge complete Battery Operation ...

Page 24: ... on bottom half of pump 3 Grasp and remove battery pack by pulling it up and away from pump body 4 Align connector of new battery pack with connector in pump body 5 Gently press new battery pack into pump body until it is flush with the pump case and replace the three screws Ensure that the long screw is replaced in the top screw hole Do not overtighten screws Belt clip Battery pack Battery connec...

Page 25: ...m a sampling strategy of up to 10 sampling sequences and flow rates Program a delayed start timed shutdown or perform STEL and replicate samples Create a sample and analysis sheet for all critical information Print or save to a PC file a complete history of run time data Create a worker exposure profile containing sample and analysis information along with the pump s history Then import this into ...

Page 26: ...ired or rebuilt battery pack voids the SKC warranty and the UL Intrinsic Safety Listing Li Ion Battery Shipment Rechargeable lithium Ion batteries for use with SKC sampling pumps have been tested in accordance with the UN manual of Tests and Criteria and are designated as UN3091 For air shipments Rechargeable lithium Ion batteries in SKC pumps are subject to the A 45 exemption to the IATA regulati...

Page 27: ... for use with SKC sampling pumps have been tested in accordance with the UN Manual of Tests and Criteria and are desig nated as UN3091 To be exempt from Dangerous Goods Shipping requirements the box must contain 12 or fewer lithium batteries or 24 or fewer cells Therefore limit any box to be shipped to the following number of pumps Leland Legacy Pump 2 pumps QuickTake 15 12 pumps QuickTake 30 3 pu...

Page 28: ...perty damages for loss of use loss of time loss of profits loss of income or other incidental damages Nor shall buyer be entitled to recover from SKC Inc any consequential dam ages resulting from defect of the instrument including but not limited to any recovery under section 402A of the Restatement Second of Torts 3 This warranty extends only to the original purchaser of the warranted instru ment...

Reviews: