2.

 

INSTALLATION 

2.1.

 

DATA PANEL (OR OPERATING SPECIFICATIONS) 

Make sure that the operating parameters indicated on the data panel (V tension, Hz frequency, kW electrical power) comply with the ones of 

the installation site. 

The data panel, with information and characteristics of the unit, is applied on the left side of the unit. Models AS.003 (3.10), AS.005C (5.12) 

and AS.005ST (5.12) have it on the back side. 

 

 

 

 

 

 

 

 

 

2.2.

 

AMBIENT CONDITIONS 

The  operating temperature range for air cooled units lies b10°C and +32°C. If the temperature exceeds these limits the declared 

output and performances can be compromised and critical conditions may cause the intervention of the security switch (or security devices).  

It is therefore recommended not to place the unit next to any source of heat or expose it to direct sunlight. The least clearances indicated in the 

next 2 paragraphs should be respected. 

 

 

 

 

 

 

 

 

 

 

2.3.

 

POSITION 

Place the blast chiller in the selected position and provide to keep at least  10 cm from the back wall (see p. 12) and enough space in the front 

side for air intake. 

The blast chillers  equipped with remote unit should be installed following the indications mentioned in the 

previous section

 

(2.2),

 

thus avoiding to place them next to any source of heat, even other compressor units or heat pumps.

 

The unit must lay on a flat, steady and firm ground, so as to provide stability to all four corners and should not lean against other appliances.  

The legs can be adjusted manually or with a proper spanner for models AS.003 (3.10). 

The blast chiller lowers.

 

 

The blast chiller lifts up.

 

Slide the drip tray (optional in mod. AS.003 (3.10)) along the runners placed in the front bottom of the unit. 

If the blast chiller is not correctly leveled, its functioning and condensation flow may be compromised. 

In the roll-in units the condensation drain should be kept free at least 20 mm from the nearby drain. 

Remove the protective film and clean the machine inside and outside, using protective gloves. Wash the unit inside using a light detergent, 

avoiding the use of steel wool, abrasive sponges, solvents or any other products which might corrode or scratch the surfaces.  

 

 

 

 

 

 

 

 

 

 

 

2.4.

 

CONNECTION TO THE ELECTRIC NETWORK 

The electric connection is to be carried out through the supply cable coming out at the back of the unit. For roll-in models the instructions 

mentioned in the attached technical specifications must be respected. The cable is never to be pulled or damaged (danger of electrical accident). 

A damaged electrical cable must be immediately replaced by a qualified and authorized electrician. 

The blast chiller is to be connected to an inter-blocked plug with an effective ground wiring. The machine is non-operational only when the plug 

is not plugged into the socket. 

Install a safety switch of 30 mA on the electric supply board to grant protection for people. Make sure that the ground system is properly 

connected with the clamp (PE) through a cable with a minimum section of 16 mm

2

Provide the coordination against contact tensions, equipotential connection, through the clamp identified by the symbol 

Make sure that the voltage (V) and frequency (Hz) correspond to the ones indicated on the data panel (see page 12). 

Before connecting the cable to the power point, the machine needs to be positioned upright for at least thirty minutes; four hours waiting time 

are needed if the unit was transported laid on  its side. The liquid of the refrigerating system needs some time to stabilize, otherwise the 

compressor may be damaged. 

Summary of Contents for AS.003

Page 1: ...AND OFF OF THE BLAST CHILLER 7 4 2 2 FUNCTIONING 7 4 2 2 1 TEMPERATURE BLAST CHILLING SOFT WITH CORE PROBE 1 CONSERVATION 7 4 2 2 2 TIME BLAST CHILLING SOFT 5 CONSERVATION 7 4 2 2 3 TEMPERATURE BLAST CHILLING HARD WITH CORE PROBE 2 CONSERVATION 8 4 2 2 4 TIME BLAST CHILLING HARD 6 CONSERVATION 8 4 2 2 5 TEMPERATURE DEEP FREEZING HARD WITH CORE PROBE 3 CONSERVATION 8 4 2 2 6 TIME DEEP FREEZING HARD...

Page 2: ...ENGLISH ...

Page 3: ...achine e g gas for lighters petrol ether acetone or others The blast chiller is not a refrigerated cabinet As soon as the working cycles are over the unit turns automatically into a temporary and transitional conservation phase At the end of the cycle the product is to be stored in an appropriate refrigerator As deep freezing of foodstuff is regulated by law a qualifying license issued by the Loca...

Page 4: ... the front bottom of the unit If the blast chiller is not correctly leveled its functioning and condensation flow may be compromised In the roll in units the condensation drain should be kept free at least 20 mm from the nearby drain Remove the protective film and clean the machine inside and outside using protective gloves Wash the unit inside using a light detergent avoiding the use of steel woo...

Page 5: ...led lower than the blast chiller no syphons are needed the pipe inclination towards the compressor unit should be respected at least 3mm mt Gas proof soldering must be executed and the pipes must be emptied through both service taps Check for eventual leaks turn on the taps in the compressor unit and add gas R404A if necessary checking the liquid sign Add oil type Artic 32 synthetic if necessary c...

Page 6: ...ctions The standard working cycles are as follows TEMPERATURE BLAST CHILLING SOFT WITH CORE PROBE 1 CONSERVATION This cycle reduces the food temperature to 3 C at the core of the product with chamber temperature around 0 C Suitable for delicate or thin products TEMPERATURE BLAST CHILLING HARD WITH CORE PROBE 2 CONSERVATION This cycle reduces the food temperature down to 3 C at the core of the prod...

Page 7: ... 4 2 2 2 TIME BLAST CHILLING SOFT 5 CONSERVATION Press and release the button the led will start flashing the display will show the temperature of end cycle which can be modified with the buttons and the value 3 0 is recommended Press and release the button the led and will be steadily lighted and the working cycle including the conservation phase will start The check for the correct introduction ...

Page 8: ... the conservation phase will start The check for the correct introduction of the core probe will be activated If this test is successfully executed the cycle will go on in temperature mode 3 if the test is not successfully executed the cycle will go on as time cycle in mode 7 the led will go off and the led will switch on At this point within 5 minutes press the button or to change the duration of...

Page 9: ...t up To take the product out press the button to stop the unit remove the core probe and lay it back into the probe holder take the trays out and store the product in the provided refrigerated cabinets 4 3 RAW FISH SANITATION CYCLE The raw fish sanitation cycle consists in a special deep freezing cycle to 20 C at the core of the product followed by a 24 hours maintenance stage This kind of sanitat...

Page 10: ... products which might corrode or scratch the surfaces In short the blast chiller must be clean when used and must be left clean at the end of every working session The racks are easily removable for cleaning Reposition them once they have been washed It is important to carefully wash the inside of the unit and the door Do not scrape with sharp tools especially the cool generator Remove the drain c...

Page 11: ...ce by a technician The compressor works but the unit is not chilling Freon missing Service by a technician Broken line solenoid valve Service by a technician id Open door Close the door Broken microswitch Service by a technician HP Dirty condenser Clean the condenser see par 5 3 Space missing for a correct airflow on the front and or back of the unit Move to unit to allow a better airflow see par ...

Page 12: ... 0 8 60 70 0 260 AS 005C 5 12 AS 005ST 5 12 230 1 50 5 0 0 9 80 70 0 500 AS 005 5 15 230 1 50 5 5 1 0 100 70 0 550 AS 005 5 20 230 1 50 7 0 1 3 100 70 0 700 AS 005SG 230 1 50 2 0 0 3 85 70 0 000 AS 007 7 20 230 1 50 7 0 1 3 130 70 0 800 AS 007 7 30 230 1 50 8 5 1 5 130 70 0 900 AS 007SG 230 1 50 2 0 0 3 110 70 0 000 AS 010 10 30 230 1 50 9 0 1 6 190 70 1 000 AS 010SG 230 1 50 2 5 0 4 190 70 0 000 ...

Page 13: ...ENGLISH 13 10 WIRING DIAGRAMS ...

Page 14: ...ENGLISH 14 NOTE ...

Page 15: ...ENGLISH ...

Page 16: ... In the event that the notification is not accepted A T O s r l reserves the right to hold this warranty valid thus making known this intention on pain of ineffectiveness in writing fax is admitted or by phone within five days from receipt of the notification For the applicability of this warranty the existence of a production defect is left to the exclusive technical assessment of A T O S r l whi...

Reviews: