SL 30/35 Hull Sonar Operators Manual
974-25007001/2.0
Installation, Start-Up and Test
Page 6.1
Kongsberg Simrad Mesotech Ltd.
Port Coquitlam, BC - Canada
PART 6
INSTALLATION, START-UP
AND TEST
6.
INSTALLATION, START-UP AND TEST ........................................................6.3
6.1 INSTALLATION PROCEDURE....................................................................6.3
6.2 SURFACE UNIT ELECTRONICS INSTALLATION ......................................6.3
6.2.1 Mounting of Units ..................................................................................6.3
6.2.2 Power Considerations ...........................................................................6.4
6.2.3 Connecting the Display Unit ..................................................................6.4
6.2.4 Connecting the Processor.....................................................................6.5
6.2.5 Connecting the Operating/Interface unit .................................................6.5
6.2.6 Connecting DGPS.................................................................................6.5
6.2.7 Network LAN Connection......................................................................6.5
6.3 SONAR ROOM HULL AND TRANSCEIVER UNIT INSTALLATION ............6.6
6.3.1 Sonar Room Mounting Space ...............................................................6.6
6.3.2 Mounting the Transceiver unit ...............................................................6.7
6.3.3 Mounting the Lower and Raise Hoist Unit .............................................6.7
6.3.4 Mounting the Motion Sensor .................................................................6.8
6.3.5 Mounting the Tank (Trunk) Unit ............................................................6.8
6.4 ASSEMBLING THE FLANGE, SONAR DOME, SHAFT AND TANK GUIDE 6.9
6.4.1 Required Tools .....................................................................................6.9
6.4.2 Tank Flange and Shaft Prepping ........................................................6.10
6.4.3 Assembling the Sonar Dome, Shaft and Tank Guide Assembly..........6.10
6.4.4 Mounting the Flange and Sonar Dome to the Tank (Trunk) ................6.12
6.4.5 Mounting the Hoist Unit.......................................................................6.13
6.4.6 Mounting the Transceiver....................................................................6.14
6.5 INTERCONNECTION WIRING DIAGRAM ................................................6.14
6.5.1 Motion Sensor Electrical Connection...................................................6.14
6.6 SL 30 OR SL 35 SYSTEM START-UP AND TEST ....................................6.14
6.6.1 SL 30/35 Start Up ...............................................................................6.14
6.6.2 Power-Up Configuration......................................................................6.15
6.6.3 SL 30 or SL 35 Start up Procedure .....................................................6.15
6.6.4 SL 30/35 RUN UP Procedure .............................................................6.21
6.6.5 Display Settings ..................................................................................6.22
Summary of Contents for SL 30
Page 1: ...SL 30 35 HULL SONAR OPERATORS MANUAL 974 25007001 Issue 2 0 September 2003...
Page 2: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......