To access the Auto Jog function, you must press “SHF” (F5) and then select “AJG”
(F2) from this alternate menu (See Figure 11). See Figure 12 for an example of
how to set up an auto jog operation.
Figure 11 Auto Jog Selection
To set up an Auto Jog operation:
1. Select the “Min. KW” area. A number pad will open. Enter a value
below the available from the main screen. Press ENT to accept the
entry.
2. Select the “Max. KW” area. A number pad will open. Enter a value
below or equal to the available from the main screen. Press ENT to
accept the entry.
3. Select the “# Steps” area. A number pad will open. Enter the desired
number of steps for the load bank to go from the minimum to the
maximum. Press ENT to accept the entry.
4. Select the “Interval” area. A number pad will open. Enter the desired
amount of seconds for the load bank to hold on each interval step.
5. The “Entry” value will be what the current step’s value will be.
6. The “Running” value will be the current metered value.
Figure 13 Auto Jog Chart
Figure 12 Setting Auto Jog
Summary of Contents for NORTHSTAR 125 KW
Page 1: ...110 KW POWERSTAR DIGITAL LOAD BANK 125 KW NORTHSTAR 150 KW NORTHSTAR Document Number DOC 00668...
Page 2: ......
Page 9: ...Page 7...
Page 10: ...Page 8...
Page 11: ...Page 9...
Page 12: ...Page 10...