6.5 Shutdown
1. To shut down the Load Bank, de-energize the load by switching the
“Load” switch to “Off.”
2. Select the “Fan” switch to “Off.” The unit will begin a cooldown phase
for a set duration. If desired, the cooldown timer can be set to zero.
3. Disconnect all the connections to the load bank and store the load
bank as desired.
6.6 Additional Screens and Programming Information
6.6.1 Setup Information
There are a few features that need to be setup behind the scenes for the load
bank. These settings are located in the Setup menu. From this menu, you will
be able to set the “Jog” steps , the “Cooldown” timer, and include manual load
steps. From this Setup screen, you can also view the KWHR, which serves as an
odometer.
For an explanation of the parts of the Setup menu, please see Figure 9 and Table
3 Setup Screen Definitions below.
Figure 9 Setup Explanations
Summary of Contents for NORTHSTAR 125 KW
Page 1: ...110 KW POWERSTAR DIGITAL LOAD BANK 125 KW NORTHSTAR 150 KW NORTHSTAR Document Number DOC 00668...
Page 2: ......
Page 9: ...Page 7...
Page 10: ...Page 8...
Page 11: ...Page 9...
Page 12: ...Page 10...