4. Click on the OK button.
9
The "Procedure started" window closes.
9
WaveNet Manager reaches LockNode.
5.6.4 Test reachability (LSM)
You can use LSM to test whether the network node of a WaveNet locking
device is functioning properly and can be reached by LSM.
ü
LSM is open.
ü
WaveNet is created.
ü
WaveNet topology imported (see
).You will see a list
of WaveNet-relevant components.
1. Open the assignment via | Network | - Group orders - WaveNet nodes .
9
The window "Group order for WaveNet nodes" opens.
WaveNet
(Manual)
5. WaveNet Manager
177 / 210