Sime super mk.ii Installation And Servicing Instructions Download Page 9

protected by a purpose designed guard. Terminal guards
are available from Quinnell, Barrett, and Quinnell, Old Kent
Road, London. State model C2, (G.C. Part No 382946).

– Where  the  terminal  is  fitted  within  850  mm  (34  in)  of  a

plastic  or  painted  gutter,  or  450  mm  (18  in)  of  painted
eaves, an aluminium shield at least 1,500 mm (59 in) long
must be fitted to the underside of the painted surface.

– The air inlet/outlet flue duct MUST NOT be closer than 25

mm (1 in) to combustible material.

– In  certain  weather  conditions  the  terminal  may  emit  a

plume  of  steam.  This  is  normal  but  positions  where  this
would cause a nuisance should be avoided.

2.4

VENTILATION REQUIREMENTS

Detailled  recommendations  for  air  supply  are  given  in
BS5440:2.
The following notes are for general guidance:
– It is not necessary to have a purpose provided air vent in

the  room  or  internal  space  in  which  the  appliance  is
installed.

2.5

GAS SUPPLY

– The  gas  supplier  should  be  consulted  at  the  installation

planning  stage  in  order  to  establish  the  availability  of  an
adequate supply of gas.

– An existing service pipe MUST NOT be used without prior

consultation with the gas supplier.

– A gas meter can only be connected by the gas supplier or

their contractor.

– An existing meter should be of sufficient size to carry the

maximum  boiler  input  plus  the  demand  of  any  other
installed appliance. (BS6891: 1988).The gas required for
the boiler is specified in 

Table 4.

– The  governor  at  the  meter  must  give  a  constant  outlet

pressure  of  20  mbar  (8  inwg)  for  natural  gas  when  the
appliance is running.

– The gas supply line should be purged.

NOTE: Before purging open all doors and windows, also
extinguish  any  cigarettes,  pipes,  and  any  other  naked
lights.

– The complete installation must be tested for gas soundness.
– It  is  important  to  assure  an  adequate  gas  supply  to  the

appliance.  No  more  than  3  m  of  15  mm  pipe  should  be
used.  Where  the  supply  exceeds  3  m  the  pipe  should  be
suitably sized only reducing to 15 mm for the last 3 m prior
to the appliance.

2.6

ELECTRICITY SUPPLY

The appliance MUST be earthed. A mains supply of 230 V -
50  Hz  single  phase  is  required.  All  external  controls  and
wiring MUST be suitable for mains voltage.

Wiring  should  be  in  3  core  PVC  insulated  cable  NOT  LESS
than 0.75 mm

2

(24 x 0.2 mm) to BS6500, Table 16. Wiring

external  to  the  boiler  MUST  be  in  accordance  with  current
l.E.E. Wiring Regulations (BS 7671) and local regulations. The
supply connection to the flying lead provided MUST be made
to a fused double pole switch, having a 3 mm (1/8 in) contact

separation  in  both  poles,  serving  only  the  boiler  and  system
controls. The fuse rating should be as per the original instruc-
tions.  This  connection  should  be  readily  accessible  and  be
made adjacent to the boiler (except in the case of bathroom
installations for domestic boilers where the point of connec-
tion to the mains MUST be outside of the bathroom).

2.7

EXTERNAL CONTROLS (Refer to section 3.10)

The boiler is intended for use with a 240 V room thermostat.
The connection is made inside the control box as described in
section 3.10.

2.8

WATER SYSTEMS - GENERAL

– This appliance is designed for connection to sealed central

heating water systems.

– Check that the mains water pressure is sufficient to pro-

duce  the  required  D.H.W.  flow  rate,  but  does  not  exceed
the  maximum  D.H.W.  pressure  (

Table  4).  If  necessary,  a

pressure reducing valve must be fitted to the mains supply
before the D.H.W. inlet connection.

2.9

REQUIREMENTS FOR SEALED WATER SYSTEMS

The heating system design should be based on the following
information:
a) The available pump head is given in fig. 4.
b) A minimum flow rate corresponding to a heating differen-

tial of 11°C must be obtained at all times.

c)

A  heating  by-pass  is  usually  only  required  when  micro-
bore piping is used on the system.

If however condition (b)

can  not  be  satisfied  a  heating  by-pass  should  be  fitted.  If
thermostatic  radiator  valves  are  to  be  installed,  at  least
one radiator should be without a thermostatic valve (usu-
ally the bathroom radiator).

d) A sealed system must only be filled by a competent person

using  one  of  the  approved  methods  shown  in  fig.    6.  The
system design should incorporate the connections appro-
priate to one of these methods.

e) The following paragraphs outline the specifications of the

items fitted to the boiler.

5

0

600

200

1600

1400

1200

1000

800

600

400

PORTATA (l/h)

PREV

ALENZA RESIDU

A (mbar)

500

400

100

200

300

con by-pass
senza by-pass

25

30

25

30

Flow rate (l/sec)

A

vailable 

head 

(mbar)

Fig. 4

1 Available Head for   

“90 Mk.II”

model

2 Available Head for 

“105 Mk.II”

model

1

1

2

2

with boiler by-pass

without boiler by-pass

Summary of Contents for super mk.ii

Page 1: ...Super Mk II Installation and servicing instructions GB ...

Page 2: ...ill be made for a service visit where the fault is not due to a manufacturing defect Has a correct by pass been fitted and adjusted Has the system and boiler been flushed Is the system and boiler full of water and the correct pressure showing on the pressure gauge Is the Auto Air Vent open Has the pump been rotated manually Is the gas supply working pressure correct Is the boiler wired correctly S...

Page 3: ... 7 3 INSTALLING THE BOILER 3 1 UNPACKING THE BOILER 8 3 2 FIXING THE BOILER MOUNTING FRAME 3 3 WATER CONNECTIONS 9 3 4 HANGING THE BOILER 3 5 FLUE AND TERMINAL PREPARATION 3 6 FLUE AND TERMINAL INSTALLATION 10 3 7 SEPARATE DUCTS 11 3 8 GAS CONNECTIONS 13 3 9 SAFETY VALVE CONNECTION 3 10 WIRING INSTRUCTIONS 3 11 TIME CLOCK INSTRUCTIONS 14 4 COMMISSIONING AND TESTING 4 1 FILLING THE WATER SYSTEM 14 ...

Page 4: ...USTION CHAMBER INSULATION 8 3 FAN ASSEMBLY 8 4 MAIN BURNER 8 5 IGNITION DETECTION ELECTRODES 8 6 GAS VALVE 23 8 7 AIR PRESSURE SWITCH 8 8 LIMIT THERMOSTAT 8 9 OVERHEAT THERMOSTAT 8 10 THERMISTOR 24 8 11 IGNITION CONTROL BOX 8 12 DRIVER PCB 8 13 PUMP 8 14 D H W HEAT EXCHANGER 8 15 DIVERTOR VALVE COMPLETE 8 16 DIVERTOR VALVE MICROSWITCH ASSEMBLY 8 17 C H EXPANSION VESSEL 8 18 PRESSURE GAUGE 25 8 19 ...

Page 5: ...ate flues kit see section 3 for details The boiler is designed for use with sealed primary water sys tems and is supplied fully assembled and equipped with com plete valve packs If the wall thickness is less than 0 5 m 19 in the appliance can be installed from inside the room without access to the external wall although a wall liner is required This is available as an optional extra and full detai...

Page 6: ...NG RANGE 10 5 35 700 13 5 46 200 2 4 1 0 12 5 42 600 15 9 54 200 3 8 1 5 14 5 49 500 18 2 62 200 5 1 2 0 16 5 56 400 20 6 70 200 6 4 2 6 18 5 63 300 22 9 78 200 7 7 3 1 X 20 6 70 200 25 3 86 200 9 0 3 6 22 6 77 100 27 6 94 200 10 3 4 1 24 6 84 000 29 9 102 200 11 6 4 6 26 6 90 900 32 3 110 200 12 6 5 1 DOMESTIC HOT WATER Max 26 6 90 900 32 3 110 200 12 6 5 1 Min 10 5 35 700 13 5 46 200 2 4 1 0 Dif...

Page 7: ...valve with charging 7 NTC sensor 8 100 C safety thermostat 9 Air relief valve 10 Circulation pump 11 Expansion vessel 12 Safety valve 13 Drain plug 14 Manometer 15 Automatic by pass 16 D H W filter 17 C H return cock 18 C H flow cock 19 D H W cock 20 Gas cock 21 Limit thermostat 22 Frost stat 23 Non return valve Fig 2 ...

Page 8: ...he current I E E Wiring Regulations BS 7671 and in Scotland the electrical provisions of the Building Regulations applicable in Scotland A compartment used to enclose the appliance MUST be designed and constructed specifically for this purpose An existing cupboard or compartment may be used provided it is modified accordingly Where installation will be in an unusual location special procedures may...

Page 9: ...PVC insulated cable NOT LESS than 0 75 mm2 24 x 0 2 mm to BS6500 Table 16 Wiring external to the boiler MUST be in accordance with current l E E Wiring Regulations BS 7671 and local regulations The supply connection to the flying lead provided MUST be made to a fused double pole switch having a 3 mm 1 8 in contact separation in both poles serving only the boiler and system controls The fuse rating...

Page 10: ...uld be fitted as shown above Take note of the requirements relative to container capacity height above system inclusion of a non return valve stop cock and automatic air vent in the feed pipe as shown in fig 5 Note also the feed pipe connection is made to the heating return as close to the appliance as possible The Local Water Undertaking MUST approve ALL connections between the system and a water...

Page 11: ...nection The final 600 mm 24 in of the mains supply pipe to the boiler must be copper A maximum D H W flow rate of 10 3 l m 2 3 gpm 13 l m 2 9 gpm for Super 105 Mk II is recommended Higher flow rates will not damage the appliance but may lower the water temperature below an acceptable level If the appliance is installed in an area where the temporary hardness of the water supply is high say over 15...

Page 12: ... section 2 2 and the requirements for flue position section 2 3 and minimum clearances Table 2 are satisfied These minimum clearances are essential to provide access for servicing For the rear flue application fix the flue template 14 to the frame with the selftapping screws provided Mark the position of the two upper installation frame fixing holes the two lower frame fixing holes and the flue ai...

Page 13: ...ember locates onto the installation frame Screw the adjusting screws 15 fig 7 until the appliance is secure and vertical Connect the isolation valves to the boiler using the gaskets provided 3 5 FLUE AND TERMINAL PREPARATION If the wall thickness is less than 0 5 m 19 in the flue air duct may be fitted without access to the outside wall providing that the optional wall liner kit is used This consi...

Page 14: ...an 1 m 3 6 1 Installations from inside the room Wall thicknesses up to 0 5 m 19 in only Hole diameter suffi cient to accept wall liner 130 mm 5 1 4 in if optional kit is used A wall liner 127 mm 5 in internal diameter 500 mm 19 in long is available as an optional extra for use when fitting the flue air duct from inside the building or where it is required to seal the hole through a cavity wall Cut...

Page 15: ...re that the silicon seal on the fan outlet correctly engages and forms a seal at its joint with the elbow This must be checked from inside the sealed chamber Secure the elbow onto the top of the appliance using the four screws and washers provided and refit the sealed chamber front panel 3 7 SEPARATE DUCTS Optional alternative twin pipe system When installing the separate ducts comply with the req...

Page 16: ...nction n 5 code 8092700 120 ø 80 160 KEY 1 Sponge rubber gasket ø125 95 2 Fixing screw 3 Air smokes flow splitting unit with take off point 4 Sectors diaphragm ø 38 Fig 14 Fig 15 Fig 16 Example of allowable installation calculation Super 90 Mk II model in that the sum of the head losses of the single fittings is less than 9 00 mm H2O Intake Outlet 7 meter horizontal pipe ø 80 x 0 20 1 40 7 meter v...

Page 17: ...ted in the valve and extend the pipe to ensure that any discharge from the safety valve is safely routed to a drain The discharge pipe should be a minimum of 15 mm copper and should avoid sharp corners or upward pipe runs where water may be retained 3 10 WIRING INSTRUCTIONS Refer to sections 2 6 2 7 and fig 19 The external wiring is connected to the boiler via a lead cable situated behind the cont...

Page 18: ... Ensure that the rotary switch on the facia panel is set to the SUMMER position D H W Only turn the D H W ther mostat to maximum fully clockwise and turn on the electri cal supply Fully open any D H W tap and the burner will light Allow the boiler to run for at least 5 minutes and check that the burner pressure is as stated in section 1 3 The D H W burner pressure is factory set and should not req...

Page 19: ... an acceptable D H W temperature To set the D H W flow procede as follows select Summer position and turn the D H W ther mostat to max fully open the D H W tap furthest from the boiler check that the boiler is firing at maximum burner pressure adjust the D H W flowrate by turning the restrictor lever on the divertor valve until a D H W temperature rise of approx 35 C is achieved This corresponds t...

Page 20: ...old by disconnecting the four screws Inspect and if necessary clean the injectors electrodes and the main burner bars 5 2 FAN ASSEMBLY Disconnect the electrical connections to the fan Note the position of the earth conductor 16 the installer should Give the Users Instructions to the householder and emphasise their responsibilities under the Gas Safety Installation and Use Regulations 1996 as amend...

Page 21: ...iagrams section 7 to earth pin on plug Resistance should be less than 1 Ω ohm If the resistance is greater than 1 Ω ohm check all earth wires for continuity and all contacts are clean and tight If the resistance to earth is still greater than 1 Ω ohm then this should be investigated further 6 2 SHORT CIRCUIT CHECK Switches turned FULL ON meter set on Ω ohms x 1 scale Test leads from L to N on appl...

Page 22: ... Replace the pump Check pump connection Set right the contacts Is there continuity between power terminals of PCB control board and PCB ignition Is sensor OK Check gap between the ignition electrode and hood check if the electrode lead and fit are not damaged Does it now spark Is there 230V AC available between 11 and 4 terminals and between 11 and 10 terminals of PCB ignition Replace the PCB cont...

Page 23: ... connection Clean or replace filter at inlet of divertor valve Set right the contacts Replace fuse F1 Is there continuity between power terminals of PCB control board and PCB ignition Is sensor OK Replace sensor Is there 230V AC available between 11 and 4 terminals and between 11 and 10 terminals of PCB ignition Replace the PCB control board Is there 230V AC available at the fan terminal Replace t...

Page 24: ...ectrode ER Detection electrode A SIT 503 control box TS 100 C safety thermostat OP Time clock PF Air pressure switch V Fan P Circulation pump VP Divertor valve TAG Frost thermostat C Rotary switch TA Room thermostat M Modulator SM C H sensor TL Limit thermostat F1 Fuse Note The room thermostat must be connected to the terminals 22 23 20 Fig 25 ...

Page 25: ...Gas valve with control box 4 D H W exchager 6 Combustion chamber 7 Water gas exchager 10 100 C safety thermostat 11 NTC sensor 12 Limit thermostat 13 Air relief valve 14 Circulating pump 15 Fan 16 Smoke pressure switch 17 Frost stat Fig 26 Super 105 Mk II model ...

Page 26: ...ion panels followed by the rear panel re assemble in reverse order refill and recommission the system as described in section 4 8 3 FAN ASSEMBLY Remove the casing front panel and sealed chamber front panel as described in section 5 1 Disconnect the electrical connections to the fan Note the position of the earth conductor Unscrew the four screws securing the fan mounting plate Drop and tilt the fa...

Page 27: ...ectly set by turning on and off the D H W inlet valve several times and ensuring that the pressure returns to that pre viously adjusted Isolate the power supply re connect the modulation lead restore the power and re check the maximum pressure then re fit the plastic cover 1 Reduce the D H W draw off rate to the minimum neces sary to maintain the burner alight by carefully adjusting the D H W Inle...

Page 28: ...he D H W circuit by opening any D H W tap below the level of the boiler Remove the two screws pivot the control box downwards Disconnect all union connections to the D H W heat exchanger and remove the heat exchanger Fit new heat exchanger and re assemble in reverse order using the new gaskets supplied with the heat exchanger Refill and re commission the system as described in section 4 1 8 15 DIV...

Page 29: ...nd re assemble in reverse order Refill and re commission the system as described in section 4 1 8 20 AUTOMATIC AIR VENT Remove the casing front panel as described in section 5 1 Isolate the C H flow and return valves 17 18 fig 2 Drain the appliance through the drain point 13 fig 2 Unscrew the automatic air vent Fit the new automatic air vent using a suitable jointing com pound and re assemble in r...

Page 30: ...t Ø 12x18x2 51 6226403 O ring 2031 52 6017211 Manual air vent 1 4 53 6040201 Pressure relief valve 54 6124803 Myson CP51AS pump 1 90 54 A 6124810 Myson CP61AS pump 1 105 55 6013100 Automatic air vent 3 8 56 2030229 Gasket Ø 22x30x2 Position Code Description Model 57 6264812 C H return pipe 90 57 A 6264822 C H return pipe 105 58 6264712 C H flow pipe 90 58 A 6264721 C H flow pipe 105 59 6146700 Lim...

Page 31: ...ressure nipple 90 33 6229209 Fan mounting plate 90 33 A 6229210 Fan mounting plate 105 34 6225615 Fan 90 34 A 6225613 Fan with venturi 105 Position Code Description Model 35 6139606 Combustion chamber front panel 90 35 A 6139608 Combustion chamber front panel 105 36 6139754 Combustion chamber front insulation 90 36 A 6139756 Combustion chamber front insulation 105 37 6229101 Smoke pressure switch ...

Page 32: ...19571 Lower closing panel 74 6272910 Control panel 75 6044022 Gem 76 6217003 Temperature and pressure gauge 77 6197707 Time programmer 78 6230679 Control board 79 6201501 Trimmer spindle Ø 5 80 6201502 Trimmer spindle Ø 6 Position Code Description Model 81 6260701 Rotary switch 82 2211610 Earth faston 83 6273010 Control panel protecting cover 84 6273110 Room stat connection cover 85 6230921 Knob Ø...

Page 33: ...nd in depth technical training courses FREE LUNCH Certificate on completion of the course Please fill in the form below for more details Combination Boilers Name Address Postcode Tel No Company Please hand this slip to your local merchant or return it to SIME HEATING products UK ltd Jubilee Works Middlecroft Road Staveley Chesterfield Derbyshire S 43 3XN Tel 01246 471950 Fax 01246 281822 ...

Page 34: ... n g p ro d u c t s u k l t d Jubilee Works Middlecroft Road Staveley Chesterfield Derbyshire S 43 3XN Tel 01246 471950 Fax 01246 281822 For service enquiries and boiler faults contact our service company on Tel 01246 470777 Fax 01246 470094 ...

Reviews: