should be installed as shown in fig.
5/a.
Connect the burner and system circu-
lation pump power cables supplied.
NOTE: Device must be connected to
an efficient earthing system.
SIME declines all responsibility for
injury caused to persons due to fai-
lure to earth the boiler.
Always turn off the power supply
before doing any work on the electri-
cal panel.
47
GRIGIO-GREY
GRIGIO-GREY
Fig. 5/a
KEY
IG
Main switch
TB
Tank stat
R
Relay
TL
Limit stat
TS Safety stat
EI
Summer/Winter switch
TC Boiler stat
SPA Water pressure gauge triggered light
SA Power on light
PA Water switch
PI
C.H. pump
PB D.H.W. pump
B
Direct Feeding Burner (not supplied)
B1 Permanent Feeding Burner (not supplied)
TA
Room stat
OP Timer programmer
NOTE: When connecting the room stat (TA) remove
the bridge between terminals 20-21.
When connecting the Timer Programmer (OP)
remove the bridge between terminals 30-31.
NOTE: The brown (capped off) cable has to
be exclusively used in case of permanent
feeding burners (type B1).