background image

 

 
 

Mini PCIe_EVB kit_ 
User Guide_V1.00

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Mini PCIe EVB Kit

Page 1: ...Mini PCIe_EVB kit_ User Guide_V1 00...

Page 2: ...be in the customer s possession Furthermore system validation of this product designed by SIMCom within a larger electronic system remains the responsibility of the customer or the customer s system...

Page 3: ...ace 11 3 3 SIM card interface 12 3 4 Antenna Interface 13 3 5 UART port interface 14 3 6 LED Indicator and Switch 15 4 Test Interface 17 4 1 J2001 17 4 2 J2002 18 4 3 J2003 19 5 EVB and Accessory 20 6...

Page 4: ...11 TABLE 3 EARPHONE INTERFACE 11 TABLE 4 UIM CARD SOCKET 12 TABLE 5 MAIN UART PORT 14 TABLE 6 DEBUG UART PORT 15 TABLE 7 WORKING STATE OF LED AS LIST 15 TABLE 8 FUNCTION OF SWITCH 16 TABLE 9 J103 INTE...

Page 5: ...HYPER TERMINAL 22 FIGURE 17 NAME THE HYPER TERMINAL 22 FIGURE 18 CHOOSE THE RIGHT COM PORT 23 FIGURE 19 SET UP THE COM PROPERTY 24 FIGURE 20 CONNECT THE MODULE 24 FIGURE 21 MAKE A CALL 25 FIGURE 22 O...

Page 6: ...ange Author 2014 05 05 1 00 Origin Honggang Ma SCOPE This document describes how to use Mini PCIe EVB to do test user can get useful information about the Mini PCIe EVB quickly through this document T...

Page 7: ...Smart Machine Smart Decision 1 Mini PCIe EVB Figure 1 EVB top view Mini PCIe _EVB kit_User Guide_V1 00 7 2014 05 05...

Page 8: ...function C Mini PCIe card holder D Indicator LED E System power 3 3V F Power on key reserved G System reset key H Power switch J RF control switch K WM8960 clock enable signal reserved M Micro USB con...

Page 9: ...Decision 2 EVB Accessory A B C D E F Figure 3 EVB accessory A GSM WCDMA LTE Antenna B 5V DC adapter C Antenna cable D Mini PCIe EVB E Micro USB cable F GPS GLONASS Antenna Mini PCIe _EVB kit_User Guid...

Page 10: ...sion 3 Accessory Interface 3 1 Adapter Interface Figure 4 Adapter interface Table 1 5V adapter interface Pin Signal I O Description 1 Adapter input I 5V 2 0A DC source input Mini PCIe _EVB kit_User Gu...

Page 11: ...1P O Positive microphone input 4 MIC1P I Positive receiver output Table 3 Earphone interface Pin Signal I O Description 5 MIC2 Headphone I O Auxiliary audio input output Note The default audio channel...

Page 12: ...GND Ground 2 UIM_VPP NC 3 UIM_DATA I O External UIM card data signal 4 UIM_CLK O External UIM card clock signal 5 UIM_RST O External UIM card reset signal 6 UIM_VDD O Power source for the external UI...

Page 13: ...a Interface Figure 7 Antenna interface Note This chapter takes SIM7250E as an example the sequence of antennas maybe different customer should refer to the relevant Hardware Design document Mini PCIe...

Page 14: ...UART Reserved Table 5 Main UART port Pin Signal I O Description 1 DCD O Data carrier detection 2 TXD O Transmit data 3 RXD I Receive data 4 DTR I Data Terminal Ready 5 GND GND 6 7 CTS I Clear to Send...

Page 15: ...icator LED and function switch the detail function please refer to table 7 and table 8 Table 7 Working state of LED as list Ref No Name Function description D104 VCC3V3 indicator Bright system has the...

Page 16: ...ator Bright USB cable inserted Extinct USB cable does not insert Table 8 Function of switch Ref No Name Function description S101 VCC3V3 indicator Bright system has the 3 3V power Extinct system does...

Page 17: ...in Signal I O Description 1 WPAN I Reserved for WPAN 2 PCM_SYNC O PCM frame synchronization 3 WLAN I Reserved for WLAN 4 PCM_IN I PCM data input 5 WWAN I Network status indicator 6 PCM_OUT O PCM data...

Page 18: ...TXD_1V8 O 3 RTS_1V8 O 4 RXD_1V8 I 5 RI_1V8 O 6 DTR_1V8 I 8 DCD_1V8 O Reserved for future use 1 8V voltage domain 7 DBG_TXD_1V8 O 9 DBG_RXD_1V8 I Reserved for DEBUG 1 8V voltage domain 10 UIM_RST O UIM...

Page 19: ...3 RTS_3V3 I 4 DTR_3V3 O 5 TXD_3V3 I 6 RI_3V3 I 7 RXD_3V3 O 8 DBG_TXD_3V3 I 9 10 DBG_RXD_3V3 O The UART port is a full function serial port reserved for debug and future use 3 3V voltage domain The DB...

Page 20: ...y The EVB and its accessory are equipped as the Figure 14 Figure 14 EVB and accessory Note the headset is not included in the EVB Kit S101 and S103 switch up and set the S104 at the middle position Mi...

Page 21: ...certain frequency and user can judge registering status of the module by the HL101 For detailed description please refer to document 1 6 2 Registering Network and making a call User should setup the d...

Page 22: ...he module as following steps z Open the HyperTerminal START All Programs Accessory Communication HyperTerminal Figure 16 Run the hyper terminal Figure 17 Name the hyper terminal z Configure the serial...

Page 23: ...Decision Figure 18 Choose the right COM port z Set the baud rate and flow control User can set the baud rate from 1200bps to 115200bps and the flow control set to None Mini PCIe _EVB kit_User Guide_V...

Page 24: ...ure 20 Connect the module 6 Click the call icon z Typing the AT command When module is powered on user must firstly send AT to synchronize the baud rate The default setting of the module is autobaudin...

Page 25: ...de_V1 00 25 2014 05 05 Figure 21 Make a call 7 User can also operate the GPS with the AT CGPS command then user can see the NMEA information from the SimTech HS USB NMEA Port Refer to the AT Command d...

Page 26: ...fter the tool is opened it will scan the device if the module is ready the tool will display like the following picture 1 2 3 4 5 6 7 8 9 10 11 12 Figure 23 Run the download tool 1 The upgrade files d...

Page 27: ...module Then user could run the tool Tool will scan the device automatically if the module is ready the tool will prompts the user to upgrade Figure 24 Browse the software package File path Upgrade FW...

Page 28: ...ck the Scan Device button The tool will re enumeration and connection device to determine whether the device is in the ready state BackupQCN Before upgrading the FW file may require to backup the QCN...

Page 29: ...Smart Machine Smart Decision Figure 26 Backup QCN Backup finished Figure 27 Backup finished own FW D Mini PCIe _EVB kit_User Guide_V1 00 29 2014 05 05...

Page 30: ..._User Guide_V1 00 30 2014 05 05 FW button to upgrade firmware this process may take several minutes to complete In the process Click Down of upgrading do not close the PC tool or unplug the device Fig...

Page 31: ...n Figure 30 Downloading in process pgrade finished tool will re enumeration and connection device if device is ready U Figure 31 re enumeration and connection device RecoverQCN Mini PCIe _EVB kit_User...

Page 32: ...Smart Machine Smart Decision Mini PCIe _EVB kit_User Guide_V1 00 32 2014 05 05 CN button to recover QCN just backup Click RecoverQ Figure 32 Recover QCN Recover finished Figure 33 Recover QCN finished...

Page 33: ...tton to upgrade image file through ADB If the first upgrade failed will retry later The tool set failure timeout monitoring time is 2 minutes Figure 34 Down AP Upgrade finished Figure 35 Down AP finis...

Page 34: ...grade button to push the file named cdrom_install iso in the ISO folder into the module s CD ROM for the installation of PC management software Figure 36 ISO Upgrade Push finished Figure 37 Push finis...

Page 35: ...cal plants or where blasting operations are in progress Operation of any electrical equipment in potentially explosive atmospheres can constitute a safety hazard Your cellular terminal or mobile recei...

Page 36: ...de_V1 00 36 2014 05 05 are in use e g lock functions fixed dialing etc You may have to deactivate those features before you can make an emergency call Also some networks require that a valid SIM card...

Page 37: ...VB kit_User Guide_V1 00 37 2014 05 05 Contact us Shanghai SIMCom Wireless Solutions Ltd Add SIM Technology Building No 633 Jinzhong Road Changning District Shanghai P R China 200335 Tel 86 21 3235 330...

Reviews: