background image

 

 

Silicon CPV Ltd 

Akhter House, Perry Road, Harlow, Essex, CM18 7PN, UK  

Tel +44 (0) 1279 821200 Email [email protected] 

Page 7 of 24 

 

After successful completion of the 

Adaptive Learning Phase

” the system 

operation will stabilise and the light output will become predictive based on 
weather conditions.  

By default the system will automatically create an energy storage reserve 
which will provide 2 days of operational autonomy.  

 

 

Summary of Contents for Kamr 1-G2

Page 1: ...low Essex CM18 7PN UK Tel 44 0 1279 821200 Email enquiries siliconcpv co uk Solar Street Light User Manual Ver 1 7 Model Booster Panel 25W 34W 45W 60W Kamr S G2 Kamr 3 G2 Kamr 2 G2 Kamr 1 G2 Kamr L G2 Kamr 1L G2 Kamr 2L G2 Kamr 3L G2 Kamr 4L G2 ...

Page 2: ... 6 Installation Instructions for Kamr Part 1 8 Mode selection 8 Antenna Installation 9 Installation Instructions for Kamr Part 2 10 Fixing the Solar Street Light to the Pole 10 Installation Instructions for Kamr Booster Pack 12 Fixing the Booster Panels to the bracket 12 Optical Lens and Subsequent Light Distribution Patterns 14 Network Management and Monitoring 16 Maintenance and Care of Solar Li...

Page 3: ...el positioning diagram Edited battery removal process for G2 Disclaimer This document is the property of Silicon CPV and therefore cannot be copied or edited in any way without prior and written permission from Silicon CPV Unpacking Box Contents Please take care as one of the key components of the Solar Street Light is the Solar Panel that is protected via a toughened glass panel Please unbox the ...

Page 4: ... adaptor fitted ALUM0030 1 Pole adaptor fixings Security Self Tappers Pin Torx BH 10 x 3 4 4 8 x 19mm SCREW0039 3 Installation Guide including Warranty Certificate GUIDE001 1 Antenna 1 Booster Pack Description Silicon CPV Part No Qty Booster Panels 25W SOLARPANEL0055 34W SOLARPANEL0045 45W SOLARPANEL0035 60W SOLARPANEL0060 2 Pozi flange head self tapping screws SCREW0098 8 Hex Head Self Drilling S...

Page 5: ...flat bladed screw driver for light switch selector 1 2 Mains Operated Electric or Battery Drill 1 3 Screwdriver set pozi drive 1 4 Set of HSS drill bits must include 4 5mm for light body to pole fixing 1 5 Tape measure 1 6 Long nose pliers 1 7 Side Cutters 1 8 Sprit or laser Level 1 9 Cherry Picker or equivalent access platform for installation of Solar Light 1 10 Appropriate Personal Protective E...

Page 6: ...s Figure 1 Available Model Numbers with Optical Lens Options Please refer to the Optical Lens section for more details Available Lens Options T2 T3 T4 DN AT ME DWC DNW Model SiliconCPV Kamr S G2 SiliconCPV Kamr 3 G2 SiliconCPV Kamr 2 G2 SiliconCPV Kamr 1 G2 SiliconCPV Kamr L G2 SiliconCPV Kamr 1L G2 SiliconCPV Kamr 2L G2 SiliconCPV Kamr 3L G2 SiliconCPV Kamr 4L G2 ...

Page 7: ...tions The unit then provides users with local or remote wide area light cluster management and local light to light connectivity for wide area network communications When the light is first switched on the system begins to build a solar light model and an environmental profile This process is fully automatic however it does require 2 3 days to complete The system will need to gain data on a number...

Page 8: ...pv co uk Page 7 of 24 After successful completion of the Adaptive Learning Phase the system operation will stabilise and the light output will become predictive based on weather conditions By default the system will automatically create an energy storage reserve which will provide 2 days of operational autonomy ...

Page 9: ...er button of the switch indicates this and will be situated adjacent to and in line with the antenna see figure 2 Mode selection 1 When the button of the switch is in the position where the button if the switch is below the switch bezel the Kamr Street Light is in the OFF state 2 When the button of the switch is in the position where the the button of the switch is level with the switch bezel the ...

Page 10: ...ar street light the antenna required for network communications is included in the accessory bag Please screw the antenna in place and hand tighten Care must be taken during this process as the Antenna should not be overtightened The On Off switch is shown in different locations solely to highlight how it can be altered to take account of the specifications of the light and customer requirements F...

Page 11: ...hers protection including the use of the appropriate Personal protective Equipment PPE Please complete the following steps below to correctly install the Kamr Solar Street Light 1 For this task you will need a powered drill with a 4 5mm HSS drill bit and the 3 off Security Self Tappers Pin Torx BH 10 x 3 4 4 8 x 19mm supplied in the light carton 2 Mount the street light on the pole as shown below ...

Page 12: ...Silicon CPV Ltd Akhter House Perry Road Harlow Essex CM18 7PN UK Tel 44 0 1279 821200 Email enquiries siliconcpv co uk Page 11 of 24 Figure 4 Security Screw ...

Page 13: ...ack Fixing the Booster Panels to the bracket Please Note That before starting the Booster pack installation you ensure that the directional positioning Booster Panels aligned East West is marked out so that the booster panels work to optimum efficiency Connection Point for Booster Panels wiring to connect to controller Booster Panels fitted approximately 250 300mm down from Light Head ...

Page 14: ... 2 at the bottom per Booster panel Using a Hex Head Self Drilling Screw Stainless A2 5 5 x 38mm screw the panels must be screwed directly to the Street Light pole at approx 300mm from the light head or top of the pole to ensure that the cable will reach the controller connector correctly Each Cable connects to a matching connector on the underside of the light body Figure 6 Figure 7 ...

Page 15: ...ty It is also applicable to European S standard pedestrian lighting SiliconCPV T3 is classified as IESNA type III with a great mix of luminance and illuminance uniformity SiliconCPV T4 is classified as IESNA type IV being best suited for wider roads It is also an excellent choice for wide area lighting for example parking lots and yards SiliconCPV DN is a 2X2 array of asymmetric lenses suitable fo...

Page 16: ...mes the height of the pole SiliconCPV ME is the best of the class Typical ME4a installations are possible with the ratio of pole distance and height up to 5 5 SCPV ME is designed to fulfil ME classes on a road whose width is equal to pole height or less SiliconCPV DWC is designed for roads with longer pole distances It can be used in street lighting setups where the pole distance is six times the ...

Page 17: ...n CPV Ltd Akhter House Perry Road Harlow Essex CM18 7PN UK Tel 44 0 1279 821200 Email enquiries siliconcpv co uk Page 16 of 24 Network Management and Monitoring Please see Network Monitoring Guide for details ...

Page 18: ...olar Light may be exposed to wind rain or dusty and arid conditions over the years it is recommended to clean the glass typically every 6 months to maintain maximum performance The use of glass cleaning spray and a damp anti static microfibre cloth to clean the glass is normally sufficient to remove the dust and dirt that may have accumulated since the last maintenance session Figure 8 ...

Page 19: ...comes on but is very dim The energy captured during the daylight hours was small therefore the LED output is held low for the night time duration Check after a few days to confirm light output has increased Light comes on during the daylight hours Switch system from ON to OFF and back again Check light operates correctly Light comes at dusk but does not stay on for the night period If the light is...

Page 20: ... please follow the steps below Failure to follow the instructions below may result in the light failing to operate correctly Battery Bank and Controller Removal 1 Turn off the Street Light using the On Off switch situated on the underside of the main light body 2 Remove the two pozi screws that secure the battery pack end cap to the main light body Correct Screws Holes for the two pozi screws 3 Ca...

Page 21: ...ncpv co uk Page 20 of 24 4 Carefully pull the battery pack towards you to remove it Figure 12 5 There are no wires on the connected to the battery pack and and so removal of the battery pack can be completed at this stage 6 Using a new battery pack reverse the removal process to install the new pack Figure 11 ...

Page 22: ...hter House Perry Road Harlow Essex CM18 7PN UK Tel 44 0 1279 821200 Email enquiries siliconcpv co uk Page 21 of 24 7 Finally switch the system ON using the On Off switch on the underside of the main light body Figure 13 ...

Page 23: ...nication Wireless Network proprietary Wireless Network allows Remote Management and Control of Lights using Internet or GSM One Gateway per 200 lights and all the gateways report to a central control room Light Control Intelligent Adaptive Light level control based on energy received or predefined user selectable light level Light Hours Programmable trigger levels from Dusk till Dawn Optics Option...

Page 24: ...rred to the replacement device and your entitlement and will be documented by Silicon CPV The warranty includes the costs to Silicon CPV of work and material for the restoration and faultless operation of work by Silicon CPV personnel or designated agent To determine the warranty entitlement please submit a copy of the purchasing invoice or a copy of the warranty certificate if necessary including...

Page 25: ... line details below Silicon CPV plc Akhter House Perry Road Harlow Essex CM18 7PN UK Tel 44 0 1279 821200 Email enquiries siliconcpv co uk Disposal Information The packaging protects the Silicon CPV Lights from transportation damage Environmentally friendly packing materials are chosen for recycling purpose The Solar Street Light contains items of waste that may be hazardous to health and the envi...

Reviews: